My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002752
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:42:14 AM
Creation date
11/6/2018 3:38:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002752
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" Date: October 29,2001 <br /> Quarter: 3Q01 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 4932 Address: 16 E. Harding Way,Stockton,CA <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: SECORIRusty Benkosky <br /> Consultant Project No.: 077.43285.703 <br /> Primary Agency/Regulatory 1D No.: Sart Joaquin County Public Health Services(SJCPHS) <br /> Assembly Bill 681 Status: Property owned by ARCO <br /> WORK PERFORMED THIS QUARTER (Third Quarter - 2001): <br /> 1. Performed quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Performed additional site assessment,including the installation of five groundwater monitoring wells,and the <br /> drilling of two soil borings. <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter - 2001): <br /> i. Perform quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Prepare and submit report documenting additional site assessment. <br /> P P g <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: MW-1 through MW-9 and SVE-1 sampled quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present Onsite: Yes <br /> Current Remediation Techniques: Natural attenuation <br /> Approximate Depth to Groundwater: 263/4-28'12 ft <br /> Groundwater Flow and Gradient: Northeast @ 0.002 ft/ft <br /> DISCUSSION: <br /> Free product was present in MW-4 and SVE-1 at thicknesses of 0.02 ft and 0.01 ft,respectively.This is the first time <br /> that free product has been measured at the site. Total petroleum hydrocarbons as gasoline(TPHg) were reported in <br /> one of the eight wells sampled this quarter at a concentration of 200 ppb(MW-9). Benzene was reported in one of the <br /> eight wells at a concentration of 1.2 ppb(MW-9). Methyl tert-butyl ether(MtBE),analyzed using EPA Method <br /> 8260A,was reported in four of the eight wells at concentrations ranging from 2.2 ppb(MW-3)to 67,000 ppb(MW-6). <br /> Tert-amyl methyl ether{TAME) was reported in one of the eight wells at a concentration of 5.8 ppb(MW-1). 1,2- <br /> Dichloroethane(1,2-DCA) was reported in three of the eight wells at concentrations ranging from 3.8 ppb(MW-5)to <br /> 32 ppb(MW-1). Chemical concentrations are generally consistent with,or slightly lower than,historical data. <br /> Groundwater elevations across the site decreased by an average of 1.36 ft. Groundwater flow was to the northeast at an <br /> approximate gradient of 0.002 ft/ft,which is generally consistent with historical data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.