Laserfiche WebLink
r1 <br /> Attanit� Aghlrcid(�nnpam � <br /> Alt(()%ct%j C%tat,t)"44912 !6 I llmdinL Blvd tikxk(on ( A lanwry S 2WI <br /> groundwatcl S.lmple5 will be collected and sent to a California <br /> Certified Laboratory (Sequoia Analytical or equivalent) The <br /> groundwater samples will be analyzed for TPHg using modified EPA <br /> Method 8015 BTEX utiing EPA Method 8020, and fuel oxygenates <br /> Mt13C Di P1: I'AMI- DBE, I-I3A 1 2 DCA and EDB by CPA 8260 <br /> • Well Surne)ing Upon completion of well constru(.tlon the wells �alll <br /> be lurvcycd by a hecn,,ed 'A]lvcyol to a local hem-l-imarl, iclative to <br /> Alcan Nca le\'el GI(lrindxvalcl nadient will he Inteiplctcd utlllring, <br /> wellhead clew inons and depth-to-\vatcl Illca"ulcments <br /> • Door-to-Door Sensitive Receptor Survey A 500-foot radius door-to- <br /> door sensitive receptor survey will be performed to evaluate potential <br /> sensitive receptors in the area of the site, including undocumented <br /> domestic, irrigation, municipal, and industrial wells <br /> • Conduit Survey An underground conduit survey will be performed to <br /> locate subsurface utilities, which may potentially influence groundwater <br /> flow and plume migration However, given the depth to groundwater at <br /> the site(approximately 27 feet bgs) it is unlikely that there are utilities <br /> • in the area the may significantly influence groundwater flow <br /> Report. A report will be prepared after completion of necessary field <br /> work. The report will include soil boring logs,well construction <br /> details, soil and groundwater analytical results,chain-of-custody <br /> documentation, and conclusions <br /> Field and laboratory procedures are presented as Attachment C <br /> SCHEDULE <br /> SECOR is prepared to initiate field work within 4 weeks following approval of this <br /> work plan,the issuance of permits by the SJCEHD, the issuance of encroachment <br /> permit from the City of Stockton, and obtaining offsite access agreement. A report <br /> documenting the findings of the soil borings and well installations is anticipated to be <br /> submitted approximately 6 to 9 weeks after the completion of the field work and upon <br /> receipt of all analytical data <br /> 0-774,1296 110/WPLAW doc <br />