My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002757
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:47:19 AM
Creation date
11/6/2018 3:40:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002757
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t• <br /> Date January 25,2001 <br /> Quarter 4Q00 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4932 Address 16 East Harding Way,Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 077 42010 704 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Services <br /> Assembly BiIt 681 Status Property Owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Fourth Quarter—2000): <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Prepared and submitted,"Workplan for Additional Site Assesment and Interim Remediation/Feastbility <br /> Testing"(SECOR,January 25,200 1) <br /> WORK PROPOSED FOR NEXT QUARTER (First Quarter—2001): <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitonng report <br /> + 3 Perform additional site assesment and interim remediation/fesability testing <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Protect Monitoring/Interim Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW4 and SVE-1 are sampled quarterly <br /> Frequency of Groundwater Monitonng Quarterly <br /> Is Free Product(FP)Present On-Site No <br /> Current Remediation Techniques Natural Attenuation <br /> Approximate Depth to Groundwater 27 to 28°is feet <br /> Groundwater Gradient East-Northeast @ 0 013 ft/ft <br /> DISCUSSION: <br /> TPHg was reported in all of the five groundwater monitonng wells sampled this quarter at concentrations ranging from <br /> 116 ppb(MW-3)to 180,000 ppb(MW-4) Benzene was reported in all five of the wells sampled this quarter at <br /> concentrations ranging from 6 55 ppb(MW-3)to 9,400 ppb(MW-4) MtBE(EPA Method 8260B)was reported in <br /> every well sampled this quarter at concentrations ranging from 2 9 ppb(MW-3)to 350,000 ppb(MW4) Tert-butyl <br /> alcohol(TBA) was not reported in any of the five wells sampled this quarter Tert-amyl methyl ether(TAME)was <br /> reported in one of the five wells at a concentration of 15 ppb(MW-1) 1,2-Dichloroethane(1,2-DCA)was reported in <br /> well MW-1 at a concentration of 35 ppb Groundwater flow was to the east-northeast with a hydraulic gradient of <br /> approximately 0 013 ft/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.