Laserfiche WebLink
SECOR <br /> HEALTH AND SAFETY PLAN <br /> REVIEW AND APPROVAL <br /> CLIENT Atlantic. Richfield Company.any. SITE NAME ARCM)#4932 <br /> PROJECT NAME ARC Q 94932 iDPE Test PROJECT NUMBER. <br /> START DATE December 13, 9,000 END DATE Mny 13- 2000 <br /> I�IAJ 1'J 1 Al C'CZ L Signature1` — Date t Z 3 <br /> Plan Completed By <br /> Signature Date <br /> Project Manager <br /> / ^ Signature Date 1.2 3/� <br /> Health and Safety Officer <br /> Signature Date <br /> Corporate Health and Safety <br /> Officer <br /> This Health and Safety Plan has been written for the use of SECOR and its employees Properly trained and <br /> experienced SECOR subcontractors may also use it as a guidance document However, SECOR does not <br /> guarantee the health or safety of any person entering this site <br /> Due to the potential hazardous nature of this site and the activity occurring thereon, it is not possible to <br /> discover, evaluate, and provide protection for all possible hazards which may be encountered Strict <br /> adherence to the health and safety guidelines set forth herein will reduce,but not eliminate,the potential for <br /> injury at this site The health and safety guidelines in this Plan were prepared specifically for this site and <br /> should not be used on any other site without prior research by trained health and safety specialists <br /> SECOR claims no responsibility for its use by others The Plan is written for the specific site conditions, <br /> i <br /> purposes,dates,and personnel specified and must be amended if these conditions change <br /> 46 <br />