My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002771
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:02:13 AM
Creation date
11/6/2018 3:43:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002771
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dh <br /> IT.GENERAL SITE REQUIREMENTS AND BACKGROUND INFORMATION <br /> A Health and Safety Plan Responsibilities <br /> + Prior to beginning on-site work, the Project Manager will ensure Attachments 1-4 are completed <br /> + The Site Health and Safety Officer (SHSO) will ensure Attachments 5-8 are completed the first day of on- <br /> site work Within 24 hours of the end of field work, the SHSO will submit the completed HASP to the <br /> Health and Safety Coordinator(HSC) <br /> HSC or Competent Person to complete Attachment 1 I <br /> + The Site Health and Safety Officer will oversee the overall Plan He/she has the authority to stop work or <br /> prohibit any personnel from working on the site at any time when work is not in compliance with any aspect <br /> of the Plan <br /> + The Subcontractor Field Supervisor is responsible for implementing the Plan for his/her own employees <br /> + Each person on the site has responsibility for their own health and safety, as well as assisting others in <br /> carrying out the Plan Any person observed to be in violation of the Plan should be assisted in complying <br /> with the Plan,or reported to the Site Health and Safety Officer or the Subcontractor Field Supervisor <br /> + Any site personnel may shut down field activities if there is a real or perceived immediate danger to life or <br /> health <br /> OB. Minimum Training,Respirator Fit-Testing,and Medical Surveillance Requirements for Site Personnel <br /> + 40 hr Hazardous Waste Operations Training(HAZWOPER) <br /> + 8 hr Annual HAZWOPER Refresher Training <br /> + 8 hr Supervisor HAZWOPER Training for Site Health and Safety Officer <br /> + First Aid and CPR Training for Site Health and Safety Officer <br /> + Annual Respirator Fit Testing <br /> + Annual Medical Clearance <br /> C. Purpose of Field Work: <br /> i'' ]]�11hACF.P.xt1'AChnn T11�(lt test__llSlpg r mnnntarl PYtrar �Pm .__ <br /> D. Hazardous Materials <br /> Will any hazardous materials (chemicals) be used on-site) (If so, include MSDS's under Attachment 11 ) <br /> (YES/NO) _ES_ If YES,describe <br /> Gasoline.Patrnleum Hydirecarhons _ <br /> • FQ,ENAME ssp <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.