My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
2200 - Hazardous Waste Program
>
PR0518741
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:56 AM
Creation date
11/6/2018 8:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0518741
PE
2228
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\I\INDUSTRIAL\1010\PR0518741\COMPLIANCE INFO 1999 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
943
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ Sierra Chemical Co. <br /> L <br /> A Carus Company Work Order Request Form (electronicversion) <br /> Engineering/Safety Review: <br /> Prior To Commencing Work The Following Condition Must Be Met <br /> Safe Work Permit(Confined Space, Lockout/Tagout, Hot Work, and/or Fall Protection): N/A <br /> 0 <br /> Personal Protective Equipment (PPE) Requirements: Standard <br /> Click here to enter text. <br /> Other: Click here to enter text. <br /> Reviewed By: Alex Re non 4/5/2016 <br /> Maintenance/Contractor Work: <br /> Work Performed: <br /> Door knob installed <br /> Parts/Materials Used: <br /> Lock Entry Tvlo US3 VPC ($9.99) from ACE Hardware on Fremont <br /> Work Completed By: Justin Lankford 4/6/2016 <br /> Quality Assurance/Quality Control Review: <br /> Work Completed as Requested, Equipment/Process System Returned to Normal: <br /> yes <br /> Spare/Replacements Parts Correct, Purchase Order and Other Documentation Attached: <br /> Part correct. <br /> Reviewed By: Alex Re non 4/7/2016 <br /> APPROVALS <br /> Facility Ma er Maint___enancg2 Compliance <br /> 1/ moic off" <br /> Revision 7/13/15 Form WOR.16.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.