My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
400
>
2200 - Hazardous Waste Program
>
PR0220078
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:56 AM
Creation date
11/6/2018 8:39:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0220078
PE
2220
FACILITY_ID
FA0005324
FACILITY_NAME
SILICON TURNKEY SOLUTIONS
STREET_NUMBER
400
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22119048
CURRENT_STATUS
02
SITE_LOCATION
400 INDUSTRIAL PARK DR
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\I\INDUSTRIAL PARK\400\PR0220078\COMPLIANCE INFO\COMPLIANCE INFO 1987 - 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excellence in Ass)Lembly & Test <br /> w .siliconturnkey.com <br /> Silicon Turnkey Solutions <br /> WASTE ANALYSIS PLAN <br /> PROCESS WASTEWATER TREATMENT UNIT <br /> A. Influent Hazardous Waste stream Prior to System Consolidation and Treatment. <br /> - MECO plating line process wastewater. <br /> B. Hazardous Waste Determination for influent: <br /> STS Assembly operations will sample the water at the Wastewater treatment system a <br /> minimum once a year. A grab sample will be collected in one liter wide mouth jar during <br /> representative system operation. The sample will be sent offsite to a California certified <br /> laboratory, which will utilize appropriate testing methods to obtain Total Threshold <br /> Concentration (TLC) and Soluble Threshold Concentration (STLC), as necessary, for Zinc, <br /> Silver, Copper, Nickel and Lead. The PH of the wastewater sample will also be determined. <br /> C. Hazardous Waste Determination of Effluent: <br /> A composite sample of the dewatered sludge is collected at least once a year prior to <br /> shipment offsite. The sludge is tested or the above metals of concern at a certified laboratory <br /> utilizing appropriate test methods. <br /> The effluent wastewater is sampled once a month and analyzed by California certified <br /> laboratory for Zinc, Silver, Copper, Nickel and Lead concentrations. These values are <br /> reported monthly to the City of Manteca Public Works Department. The PH of the effluent <br /> wastewater is monitored continuously by a control system which will automatically divert the <br /> collection tank if the effluent is outside the 6.8-9.6 PH range. <br /> Silicon Turnkey Solutions <br /> 400 Industrial Park Drive, Manteca, CA 95337 <br /> Tel: (209) 239-4444 Fax: (209) 239-4882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.