My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELLY
>
214
>
2200 - Hazardous Waste Program
>
PR0517911
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 2:41:56 PM
Creation date
11/6/2018 8:40:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0517911
PE
2227
FACILITY_ID
FA0010183
FACILITY_NAME
SPACERAK
STREET_NUMBER
214
Direction
S
STREET_NAME
KELLY
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906026
CURRENT_STATUS
01
SITE_LOCATION
214 S KELLY ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\K\KELLY\214\PR0517911\COMPLIANCE 2000 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yes No Comment <br /> Extorts of HW (cont.) <br /> Chapter 12, Article 5 <br /> Does the exporter meet the requirements for use of <br /> the manifest, except that: [66262.54-] <br /> (a-b) The name and address of the foreign <br /> consignees are substituted for the name, address <br /> and EPA ID No. of the designated facilities? <br /> (c) The generator identifies the point of <br /> departure frau the U.S. under Special Handling <br /> Instructions and Additional Information? <br /> (d) For RCRA HW, the phrase "and conforms to the <br /> terms of the attached EPA Acknowledgment of <br /> Consent" is added to the end of the first <br /> sentence in the generator's certification <br /> statement? <br /> (e) The primary exporter uses the manifest <br /> provided by the Department? <br /> (f) The primary exporter requires that the <br /> consignee confirm delivery of HW in the foreign <br /> country arra describe any significant <br /> discrepancies (e.g. , manifest signed by foreign <br /> consignee and returned to generator)? <br /> (g)- In lieu of 66262.20(d) , if the shipment <br /> could not be delivered to the consignees, did <br /> the primary exporter: <br /> (1) Renotify the EPA (if RCRA HW) and the <br /> Department of a change to the original <br /> notification to allow shipment to a new <br /> consignee per 66266.53(c)? or: _ <br /> (2) Instruct the transporter to return the <br /> shipment to the U.S.? and: <br /> (3) Instruct the transporter to revise the <br /> manifest accordingly? <br /> (h) For RCRA HW, a copy of the EPA Acknowledgment <br /> of Consent monies the shipment, and is <br /> attached to the manifest or shipping paper? _ <br /> (i) The primary exporter provides an extra <br /> manifest copy for the transporter to give to <br /> U.S. customs? <br /> Does the generator submit to the Department a copy <br /> of the manifest signed by all transporters, except <br /> intermediate rail transporters, and the consignee <br /> within 30 days of shipment? [25160(b) (3) ] <br /> Revised 7/15/91 Page 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.