Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />CH. <br />❑a 1. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TELEPHONE; <br />❑ 4. PAGERS; ❑' S. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFFSITE RELEASE WILL OCCUR BY (Check all that apply): <br />cIL <br />❑a 1. VERBAL WARNINGS; [12. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TELEPHONE; <br />❑ 4. PAGERS; '❑ 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: DEAN LEDFORD <br />-C] 3. <br />PRIMARY EMERGENCY COORDINATOR NAME: DEAN LEDFORD PHONE NO.: (209) 649-1166 PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATORNAME: PHONE NO.: PHONE NO.: <br />❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br />Noe: Ifmore than one alternate emergency coordinator is designated, attach a list to order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facitity's_trocedures for containing spills and preventing and mitigazing mleases, fires and/or expbsions. <br />_ - --- _ <br />D 1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD -Up, ETC.; <br />DI. <br />2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, buih-in berms); <br />❑' 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />[34. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />[35. LINED TRENCH DRAINS AND/OR SUMPS; <br />❑ 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />[17. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />❑ 8. STOP PROCESSES AND/OR OPERATIONS; <br />[19. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />Ej 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />❑a 11. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />❑a 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />❑ 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ONSITE EMERGENCY RESPONSE TEAM; <br />❑a IS. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />[116. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />❑a 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />❑ 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br />❑ 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />❑ 21. OTHER (Specify): <br />Dz, <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all [bat apply): <br />EI. <br />❑ 1. BELLS; <br />tz <br />❑ 2. HORNS/SIRENS; <br />❑' 3. VERBAL (i.e., Shouting); <br />4. OTHERS <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, sheet comer): <br />F3. <br />NORTH WEST CORNER BUILDING <br />Note: The Emergency Coordinator must=oum for all onsite anaployees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />E4. <br />❑ 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑a 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. OTHER (Specify): tss. <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and most be included in the Contingency Plan. <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />st. <br />❑' 1. HAVE BEEN DETERMINED NOT NECESSARY; <br />❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators most describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 Page 2 of 4 <br />