My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
2200 - Hazardous Waste Program
>
PR0513576
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:39:25 PM
Creation date
11/6/2018 8:40:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513576
PE
2227
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\N\NAVY\1240\PR0513576\COMPLIANCE INFORMATION.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> SITE HEALTH AND SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name:Stockton Scavenger Association 1. Chemicals Hazards <br /> Address: 1240 Navy Dr.,Stockton <br /> ®Carcinogens:waste oil,used antifreeze <br /> Contact Person:Manual Cardenas Phone No:460-3903_ ❑Corrosives: <br /> Sweeps Number: ❑Dusts: <br /> Proposed Date of investigation inspection:May 2009 ❑Explosives: <br /> ❑Flam nables: <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation.. ❑UAR Investigation. ❑Metals: <br /> ❑Tank Closure in Place.. ❑Tank/Pipe Repair. ❑Oxidizers: <br /> ❑Tank/Pipe Removal. ❑Re-excavation. ❑PCB's: <br /> ❑ Installation of Borings/Monitoring Wells. <br /> ®Hazardous waste inspection ❑ Sampling PART III <br /> ❑Tiered Permitting inspection <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: I. Monitoring Equipment(note:Monitoring instruments must be used for all <br /> Tank Content: Tank Age: operations unless appropriate rationale or restrictions are provided) <br /> Other. ❑Combustible Gas/Oxygen Meter. <br /> ❑Detector Tubes(Specify). <br /> 4. Type of Operation:Refuse Collection Recycling Disposal C]Photo ionization Detector. <br /> ❑Organic Vapor Analyzer. <br /> 5. Release History: ❑ern'specify. <br /> Evidence of leaks/soil contamination: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Documented Groundwater contamination: []YES ❑NO <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> Level of Protection: ❑A ❑B ❑C OD <br /> 6. Potential Health and Safety ®Hard Hat. <br /> Physical Concerns:(check all that apply&describe) ®Safety Glasses/gogglm. <br /> ❑Heat or Cold Stress: °F(high ambient temp.) ®Steel toed/shank shoes or boots. <br /> ❑Flame retardant coveralls. <br /> ❑Noise Sources: <br /> ®Hearing protection. <br /> ❑Oxygen Deficiency: <br /> ❑Excavation:(falls,trips,slipping,cave-ins): ❑Respirator. <br /> espir <br /> ❑Handling and Transfer of a Hazardous Substance:(fire,explosions, ❑Respbatrid APR ❑SCBA <br /> etc..): A/P cartridge: <br /> ❑Confined space entry:(explosions): ®Safety vest. <br /> ❑Heavy equipment(physical injury&trauma resulting from moving ❑Two-way communication. <br /> equipment): <br /> ❑Other.specify PART IV-PLAN APPROVAL <br /> 7. Anticipated Biological Hazards: Plan Prepared by:Ray von Flue Date:5/13/09 <br /> ❑Snakes ❑Insects ❑Rodents ❑Poisonous Plants <br /> ❑Other/Unknown(specify): Plan Approved by: Date: <br /> 8. Narrative(provide all information which could impact Health and Safety, <br /> e.g.,power lines,integrity of dikes,terrain,etc.) <br /> EH 23081(02/19/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.