Laserfiche WebLink
Y <br /> • Fire Extinguisher Checklist <br /> Number Location <br /> 1 Maintenance sho <br /> 2 Break room <br /> 3 Lab east wall <br /> 4 Lab west wall <br /> 5 Hallwa b bathrooms <br /> 6 Hallwa b frontoffices <br /> 7 MCC room above con Vol room south <br /> 8 Control room <br /> 58 Front Desk <br /> 60 MCC Control Room <br /> 38 Wet Cake buildin north west exit <br /> 40 Wet Cake buildin north east exit <br /> 41 Wet Cake loadout east <br /> 42 Wet Cake loadout west <br /> 44 First level of millin <br /> 45 East end of cenve r tannin from rein hiss to millin <br /> 46 2nd from east end of tonus r rennin from rein bins to milling <br /> 47 Lowesl IaHorm between bins <br /> 48 Platform between bins <br /> 49 Southemmost extin uisher on railing above rain bins <br /> 50 To latfomr between bins <br /> 51 2nd level of millin <br /> 52 3rd from east end of conveyor running from grain bins to milling <br /> 53 4th from east end of conveyor running from grain bins to milli <br /> n <br /> 54 One emin uisher on the latforms between rain bins <br /> 55 Northernmost extinguisher on wiling aboverain bins <br /> 56 Middle extinguisher on railingabove rain bins <br /> 61 Pit between Grain bins <br /> 66 Commodities Shed <br /> 22 DDE North exit <br /> 23 DDE south exit <br /> 24 DDE East exit R EC EP . <br /> 25 DDE railing main Floor <br /> 26 DDE railing second boor <br /> ID <br /> 27 DDE railing third Floor <br /> • 28 5—DETop boor <br /> 29 MCC room in boiler house AUG 14 2014 <br /> 30 Bdiler room south west <br /> 31 Boiler room north west <br /> 32 Boiler room east <br /> 43 DDE stripper ENVIRONMENTAL HEALTH <br /> 59 Boiler room east <br /> 9 Truck unload South exit DEPARTMENT <br /> 10 Truck unload middle exit <br /> 11PM <br /> k unload north exit12k unload MCC Roam13nloatl14nloatl15nload57k ethanol load out62oad Out63 unload MCC Raom64 Tank Farm65 Tank Farts16 rocessin buildin b s ru tank <br /> 17 Main rocessin buildin down center aisle south <br /> 18 Main processing building down center aisle 2nd from south <br /> 19 Main processing building down center aisle 3rd from south <br /> 20 Main processing buildina dawn center aisle 4th from south <br /> 21 Main processing building by fermenter#4 <br /> 33 Main ormoessino building b li uefaction tank <br /> 34 Main Processing building by centrifuges east <br /> 35 Main Processing buildin b centrifuges west <br /> 36 Main Processing building by north exit and GA tank <br /> 37 Main processlinq buildin b exit across from caustic tank on east side <br /> 38 Main processbuildin b Fomenter#1 _ <br /> Spill Kit Checklist <br /> Number Location <br /> 11 Hazardous Waste/Oil Dispensing Area <br /> 2 SUlfudc Acid/Ammonia Tank Area <br /> 3 Tmck Load rack <br /> 4 Wet Cake Area <br /> 5 Urea/En me Stora2e Area <br /> 6 Tank Farm <br />