Laserfiche WebLink
9 0 <br />Oil Spill Prevention and Preparedness for Rapid Response <br />Participant Name: k G <br />7. Acceptable containment measures include: <br />(Check all that apply) <br />0Spill Kits <br />Ll/- Pans <br />�o Roping off the area <br />rain Covers <br />Cfioncrete Berms <br />Date:—q <br />8. Leaks and drips INSIDE of secondary containment do not need to be cleaned up. <br />TRUEFALS <br />9. A double walled tank uses an interstitial space as secondary containmenihe event <br />the inner tank leaks. <br />/FALSE <br />10. Transferring oil from one vessel to another must be supervised at all timesCRU)E <br />FALSE <br />11. Which of the following are Best Management Practices (BMPs) for a double -walled tank? <br />(Check all that apply) <br />,,"Vark the opening to the interstitial space with "DO NOT FILL" <br />Keep the tank exterior clean and free of rust or corrosion <br />n Keep the interstitial opening open in case people need to access <br />LG��� <br />OCT 0 z 2013 <br />NVlRON1ln.� -_,, <br />U. A „y.,nco@LrJ,, <br />Participant Handout SPCC Version 1.1-2014 Page 4 of 4 <br />