My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 11:34:23 AM
Creation date
11/6/2018 8:57:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\550\PR0536555\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/19/2017 3:49:38 PM
QuestysRecordID
3516661
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IVIFIED PROGRAM CONSOLIDATED FORJR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION 29 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - I <br /> BUSINESS NAME(Same as FACILITY NAME) Arco AM/PM 3. <br /> BUSINESS SITE ADDRESS SEC Of West Valpico Rd CITY Tracy 104 <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> 490-3a <br /> MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> JM 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. [:12.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,263 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILL D M c. RESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER:Veeder-Roo t 417. MODEL#: 848290- 490-8 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490-9. MODEL#(S): 7943 -208 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ 0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-18 <br /> 8•P� 8•P• (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> El99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ®1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLE ®c. SSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER:Ve a de r-Root J <br /> 49131 MODEL#: 848290-022 490 31 <br /> LEAK SENSOR MANUFACTURER: Ve a de r-ROOt 49132 MODEL#(S): 794380-208 49113 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 12 a.YES ❑b.NO 490.34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> © 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) Ve ede r-Root 49111. MODEL#(S): 848480-001 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649017 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49019 <br /> *Allowed for monitoring of unburied cmergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA]23 CCR§2636(x)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ <br /> 99.OTHER(Specify) 490-52 <br /> 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.