My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
2611
>
2300 - Underground Storage Tank Program
>
PR0505637
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:01 PM
Creation date
11/6/2018 9:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0505637
PE
2332
FACILITY_ID
FA0006913
FACILITY_NAME
SCHNABEL, CHARLES
STREET_NUMBER
2611
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
2611 W HWY 12
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\2611\PR0505637\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/19/2017 5:12:05 PM
QuestysRecordID
3690297
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> OVaCt9 <br /> STATE OFCALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD ` *o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT TEMPORARY TANK CLOSUREe TANK REMOVED <br /> DBA Oq FACILITY NAME WHERE TANK IS INSTALLED: Z I-// Lj/ J�S <br /> 1Z G <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# v / _ S. MANUFACTURED BY: /. <br /> C. DATE INSTALLED(MO/DAY/YEAR) Lle i D. TANK CAPACITY IN GALLONS: l <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUREGULARN EA ED 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY CK 1 PRODUCT ❑ 1b PREMIUM 4 <br /> 3 CHEMICAL PRODUCT GASAHOL <br /> 7 METHANOL <br /> UNLEADED ❑ 5 JETFUEL ❑ <br /> Q ❑ 95 UNKNOWN O 2 WASTE _ 2 LEADED <br /> 98 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> O. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br /> C.A.S.#: <br /> III. TANK CONSTRUCTION MARKONEITEMONLYINSOXESA,B,ANDC,ANDALLTHATAPPLIESINBOXO NDE <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTNk) ❑ 9 BRONZE O 10 GALVANIZED STEEL 0 u 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR <br /> F-11 RUBBER LINED E] EPDXY LINING <br /> 2 ALKYD LINING 3 4 PHENOLIC LINING <br /> ❑ ❑ <br /> LINING ❑ 5 GLASS LINING ❑ 6 UNLINED (1l. 95 UNKNOWN ❑ <br /> —4-1 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE IFS95 UNKNOWN O 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) <br /> OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> W.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH 95 UNKNOWN <br /> A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL p U 2 STAINLESS STEEL p U 3 POLWINYL CHLORIDE(PVC)A U <br /> CORROSION A U S ALUMINUM 4 FIBERGLASS PIPE <br /> A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION95 UNKNOWN <br /> A U 99 OTHER <br /> D. LEAK DETECTION 61 <br /> E] 1 AUTOMATIC LINE LEAK DETECTOR E] 2 LINE TIGHTNESS TESTING 3 <br /> MONRORING ❑ B8 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING O 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE 95.� UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/VR) 2.ESTIMATED QUANTITY OF <br /> SUBSTANCE REMAINING GALLO3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> NS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLED <br /> APPLICANTS NAME GE, IS TRUE AND CORRECT <br /> (PRINTED d SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE 104 CNTY# JURISDICTION III, TANK FACILITY <br /> 7 N„ <br /> PERMIT NUMBER PERMITAPPROVED BYIDDATE <br /> PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FOgM A,UNLESS A CURRENT FORMA HAS BEEN FILED. <br /> FILE THIS FORM WITH--,LOCAL AGENCY IMPLEMENTING THE UNDERGROUNDS GE TANK REGULATIONS <br /> FORM B (12-91) <br /> FORORIIBRS <br />
The URL can be used to link to this page
Your browser does not support the video tag.