My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
2611
>
2300 - Underground Storage Tank Program
>
PR0505637
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:01 PM
Creation date
11/6/2018 9:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0505637
PE
2332
FACILITY_ID
FA0006913
FACILITY_NAME
SCHNABEL, CHARLES
STREET_NUMBER
2611
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
2611 W HWY 12
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\2611\PR0505637\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/19/2017 5:12:05 PM
QuestysRecordID
3690297
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD a <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM BCOMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM.MARK ONLY ❑ 1 NEW PERMIT <br /> ONE ITEM ❑ ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION <br /> 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ <br /> 7 PERMANENTLY CLOSED ONSITE <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED; - 6 TEMPORARY TANK CLOSURE <br /> r 8 TANK REMOVED <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-. SPECIFY IF UNKNOWN rtlw L0—z <br /> A. OWNER'S TANK I.D.N <br /> C. DATE INSTALLED(MO/DAY/yEAR) B. MANUFACTURED BY: <br /> N. v <br /> D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A. VEHICLE FUEL 04011- <br /> 0 <br /> 4OIL❑ 2 PETROLEUM 9 C. ❑ 1a REGULARFADE <br /> ❑ 80 EMPTY 1 RODUCT UNLEADED 3 DIESEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 1b PREMIUM 4 GASAHOL ❑ 6 AVIATION GAS <br /> ❑ 95 UNKNOWN ❑ 2 WASTE UNLEADED ❑ ❑ 7 METHANOL <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STOPED �2 LEADED <br /> 5 JETFUEL <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8,AND C.AND ALL THAT APPLIES IN BOX D AND E C.A.S.;: <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ <br /> SYSTEM 3 SINGLE WALL WITH EXTEgIOR LINER <br /> ❑ 2 SINGLE WgLI ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) UN99 KN WN <br /> S. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ <br /> MATERIAL ❑ 5 CONCRETE ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br /> 10 GALVANIZED STEEL ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> C.INTERIOR 1 RUBBER LINED ❑ <br /> 85 UNKNOWN ❑ 99 OTHER <br /> ❑ <br /> ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING <br /> 6 UNLINED95 UNKNOWN <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? ❑ OTHER <br /> YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) 66 UNKNOWN R ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IFAPPLICABLENTION EQUIPMENT INSTALLED(YEAR) <br /> A. SYSTEM TYPE p U 1 Suc <br /> B. CONSTRUCTION A U p V 2 PRESSURE A U 3 GRAVITY <br /> I SINGLE WALL A U 2 DOUBLE WALL A V B8 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 3 LINED TRENCH q(� UNKNOWN <br /> CORROSION A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE PVC A U 99 OTHER <br /> A U 5 ALUMINUM A U 6 CONCRETE (PVC) U 4 FIBERGLASS PIPE <br /> PROTECTION A PROTECTION7 STEEL W/COATING <br /> D. LEAK DETECTION ❑U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION AUTOMATIC LINE LEAK DETECTOR p� UNKNOWN q U B 'W" METHANOL COMPATIBLE W/fRP <br /> 2 LINE TIGHTNESS TESTING <br /> V.TANK LEAK DETECTION MONROgING �99 OTHER <br /> ❑ 1 VISUAL CHECK <br /> 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 6 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING <br /> ❑ 91 NONE 95 UNKNOWry <br /> VI.TANK CLOSURE INFORMATION ❑ 99 OTHER <br /> 1.ESTIMATED DATE LAST USED(MO/DAYrYR) <br /> 2.ESTIMATED OUANTITV OF <br /> SUBSTANCE REMAINING 3.WAS TANK FILLED WITH <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND GALLONS INERTMATERIAL? YES ❑CORRECT <br /> NO <br /> APPLICANTS NAME <br /> (PRINTED a SIGNATURE) <br /> DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# COUNT-Y# JURISDICTION# <br /> CILITY <br /> PERMITNUMBER Q O C n <br /> PERMIT APPROVED BY/DATE •! O /41 <br /> FORM <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION• PERMIT EXPIRATION Dp7E <br /> FILE THIS FORM WITH TyI�LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STRRENT FORMA WE TANK REGULATIONS ILED. <br /> FORME (12.91) • <br /> FORowg-R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.