My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:49:35 AM
Creation date
11/6/2018 9:17:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\14175\PR0234383\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
9/29/2017 9:47:19 PM
QuestysRecordID
3655159
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 SAN JOAQU OUNTY ENVIRONMENTAL HEALTH ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> �E - <br /> VI. DISPENSER MONITORING <br /> Msu. <br /> MONITORING OF AREAS BENEATH DISPENSERS)[S PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MOh/y,I��ORING OF UNDER DISPENSER CONTAINMENT(UDC) M52. <br /> PANEL MANUFACTURER: Y �i t MODEL#: <br /> LEAK SENSOR MANUFACTURER: 105, MODEL#(S) MIs. <br /> a.YES C1 b.NO <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? E] a.YES ❑ b.NO <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? Ms7. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? C] a.YES C] b.NO <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK Msg <br /> ASSEMBLY MANUFACTURER: MSg. MODEL#(S): <br /> MeO. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(ttequvesagency approval) <br /> ❑ 4.NO DISPENSERS Met. <br /> 99.OTHER(Specify) <br /> I. ENHANCED LE K DE ECTION M70 <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> Mgo. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 1. W—THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2, OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" Msi <br /> 99.❑ OTHER(Specify): <br /> ar with all of the above documents relevant to their jab duties and can access those documents when needed. <br /> Personnel with UST monitoring responsibilities are famili <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> "v Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the leak detection equipment. <br /> D The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION %485Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): <br /> TYPE OF OVERFILL PREVENTION= <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05,THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION – <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. sat <br /> OWNER/OPERATOR SIGNAT E REPRESENTING DATE: ` <br /> ❑ caner Myo. y/ ' �! �7 <br /> �Operrtor d <br /> —M92 — M9; <br /> OWNE QP BATOR NAM t): OWNER/OPERATOR TITLE: `rte <br /> , QY �r R• w ���` <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑ Disapproved <br /> Date: <br /> Local Agency Signature: <br /> Comments/Special Conditions: <br /> 07/23/03 <br /> SJCEHD-d(07/03)-3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.