<br /> < ' MATERIAL ANO, WORKMANSHIP
<br /> „
<br /> 1. UNLESS OTHERWISE $PECIFIGALLY PROVIDED IN'THESE-DOCUMENTS, ALL I6 SAFETY PLAN. CONTRACTOR SHAGL..DEVELOP AND MAINTAIN FOR THE 9. DO NOT PLACE PRODUCT PI '
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WOR< PING UNDER BUILDINGS. PIPING.RUNS OVER �-
<br /> BY THEE DOCUMENTS ARE 70 BE.NEW AND OF THE MOST SUITABLE DURATION OI' THE CONTRACT Fi 91tE.HEALTH �: SAFETY PLAN THAT WILL TANKS BE MINIMIZED, MAINTAIN MINIMUM CLEARANCE AS 8HOWN ON W lA
<br /> COVERED ANp _ CORPORATE ANp IMPLEMENT REQUIRED SAFETY PROVISIONS, - DRAWINGS. MINIMIZE CRO551NG OTHER LINES AND CONDUIT.
<br /> GRAPE FOR,THE PROCE$6 INTENDED, • `
<br /> EFFECTIVELY IN
<br /> 1 11 ;
<br /> " 10, PIPING SYSTEMS SHALL. BE TESTED PER`CURRENT MANUFACTURER'S
<br /> 2. THE CONTRACTOR•SHALL. FURNISH TO THE OWINER B AGENT FOR H19 A: APPOINT AN'.EMPLOYEE A$ THE SAFETY OFFICER WHO IS QUALIFIED
<br /> INSTRUCTIONS, WHICH SHALL BE FOLLOWED ,4T ALL TIMES', AND 9NALL HAVE
<br /> APPROVAL.THE NAME: OF THEE MANUFACTURER, THE MODEL NUMBER;AND - - AND AU7HORI2EPTO SUPERVISE AND ENFORCE COMPLIANCE WITH THE PRECEDENCE OVER OTHER INSTRUCTIONS.
<br /> OTHER IDENTIFYING DATA AND INFORMATION FRA51-ECTING THE HEALTH ANP SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF - - - -
<br /> PERFORMANCE, CAPABILITY, NATURE,AND RATING OF THE MACHINERY AND THE SAFETY OFFICER TO:THE OINER'S AGENT PRIOR TO COMMENCING WORK A: G.G. TO NOTIFY dWNER9'REPRE.$ENTATIYE 7Wa WdRKING DAYS PRIOR
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES ON THE SITE. - TO LINE TESTING OWNERS REPRESENTATIVE 8HALL WITNE58 ALL LINE
<br /> '• INCORPORATING IN THE WORK WHEN REQUIRED BY.THE OWNER B AGENT. TE5TING. MARK TEST I'REe$URES ON GAUGE WITH ELECTRICAL TAPE At
<br /> B: THE PLAN $HALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE BEGINNING OF TESTS. PRE68URE $HALL HOLD,FOR AT LEAST ONEA)
<br /> 3. WHEN REQUIRED BY THESE DOCU['IENT9 OR WHEN CALLED FOR BY THE NUMBERS OF THE SUPERYIb PEORY RSONNEL,-THE HOSPITAL FACILITIES HOUR AND BE'WITNE�SSED BY 'OWkNER'S REPRESENTATIVE. DO NOT BACKFILL
<br /> OWNER5 AGENT, THE CONTRACTOR SHALL.FURN19H THE AGENT FOR NEAREST THE SITE, AND AMAP TO THE HOSPITAL, PROCEDURES SHALL BE TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE.
<br /> APPROVAL, FULL INFORIATIONCONCERNINGTHE MATERIAL ORARTICLESWRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS W
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK. WHEN 80 - OR HAZARDOUS SUBSTANCES BE UNCOVERED, : Br w ,TEST PRE66URES SHALL eE: '
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE " 2 - 50 P$I AND, APPLY SOAP SOLUTION. ZZZ_
<br /> CO7N7RACTOR'S EXPEND[?, WITH ALT, 6HIPPINCa CHARGES PREPAID. C: IF, DURING 7HE COURSE. OF THE WORK, UNSAFE CONDITIONO DEVELOP 3" 40 PSI AND APPLY $OAP SOLUTION.
<br /> 4. MAGHINERY,.EQUIPMEN't, MATERIAL, AND ARTICLES INSTALLED OR USED OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE 3" . SECONDARY - 5 P$1 AND APPLY SOAP SOLUTION. °
<br /> I CONDITION. IF'tHE.CORRECTIVEACTION 19 INSUFFICIENT. IN THE ,:
<br /> WITHOUT REQUIRED "APPROVAL SHALL BE AT THE RISK OF SUBOPINION OF TH8EOUENT ' OWNER'S AGENT, CONSTRUCTIONWORK SHALL. CEASE UNTIL C. CAUTION, p18CONNECT-FLEX CONNECTOR FROM STP AND CAP PRIOR
<br /> CORRECTIVE ACTION CTION CAN BE IMPLEMENTED. TO,T55TING., APPLY e RELEASE PRESSURE 5LOWLY VENT / VAPOR SYSTEM-
<br /> ` 'SHALL BE TESTED FROM TOP OF VENT,THROUGH MANIFOLD($),EXTRACTOR F-
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND93s PROVIDE R,A MINIMUM OF TWO FIRE EXTINGUISHER5 WITH A MINIMUM BABE AND RISE5TAGE I CONTAINMENT MANHOLES, STAGE II VAPOR 1-
<br /> ,
<br /> REGULATIONS, : CLASS RATING OF 2-A,20-S:C WITHIN 50 FEET OF THE OPERATION. LINES TO DISPENSERS AND STAGE II FLEX CONNECTORS AT DSPENSER(9).
<br /> 6. ALL MATERIALS SHALL BE IN57ALLED PER MANUFACTURER'S INSTRUCTIONS17. UNDERGROUND-5ERvICE ALERT (U.$AJ - THE CONTRACTOR SHALL NOTIFY D SLOWLY PRE55URIZE PRODUCT LIN ANO"VENT / VAPOR SYSTEM TO Ca
<br /> AND TP58E DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION MEMBERS:OF U.S.A. 2 FULL WORKING DAYS IN ADVANCE OF,PEF;6--ORMING 50 PSI, SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS.
<br /> OF THE OWNER'5 ENGINEER ANY EXCAVATION WORK BY CALLING THE TOLL`-FREE .ONE-CALL PROGRAM CORRECT ANY LEAKS AND RETEST. -
<br /> NUMBER (600) 221.2600
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR E. SLOWLY RELIEVE PRESSURE FROM, VAPOR / VENT 6Y8TEM AND REMOVE m
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF TH15 PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE
<br /> PROJECT, IT 15 EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) pETROLHUM WORK SCOPE - PRESSURE 70 S P51. MONITOR DAILY UNTIL.ALL YARD PAVING 18 Ifl 2
<br /> WOULD APPLY. COMPLETE, �U
<br /> 1. CONTRACTOR TO INSTALL NEW CANOPY FOOTINGS PER PLANS, SPECIFICATIONS
<br /> AND SHOP DRAWINGS AND ARRANGE FOR ALL INSPECtIONB. PROVIDE F 'SECONDARY PIPE MUST BE PROPERLY GUT. INSPECT:ALL PRIMARY
<br /> GENERAL OONgIT10N8 CONDUITS FOR LIGHTING, INTERCOM, AND COORDINATE RAIN LEADERS AS PIPE SURFACES. PRESSURIZE SECONDARY PIPE TO S P61 AND 5CA10 ALL V "
<br /> I. CONTRACTOR EMPLOYEE$ TO HAVE CGMPkE7Ep 40 HOURS OSHA TRAINING NECESSARY. - - PIPE SURFACE AND FITTINGS. PRESSURE ON THE'L PIPING SECONDARY
<br /> SPACE SHALL BE MAINTAINED UNTIL AFTERTHE PAVING 15 IN PLACE OVEIR
<br /> COURSE PRIOR TO THE START OF WORfC CERTIFICATION OF THIS MUST BE 2. CONTRACtOR TO SCHEDULE AND ARRANGE CANOPY WORK PER DRAWINGS AND TANK FIELD AND.PIPING RUNS,, AND $HALL BE WITNE86ED BY THE OWNERS
<br /> PROVIDED TO THE OWNERS AGENT PRIOR TO THE START OF WORK SPECIFICATION6. CONTRACTOR SHOULD BE PRESENT TO COORDINATE REPRESENTATIVE, U
<br /> PIPING MANUFACTURER-6 ELECTRICAL, INTERCOM AND DRAINAGE REQUIREMENTS, -COORDINATE W/ G.G.
<br /> 2. CONTRACTOR EMPLOYEE$ TO HAVE COMPLETED THEG. AFTER BEING WITNESSED BY OWNER'5 REPRESENTATIVE, REMOVE
<br /> TRAINING REQUIREMENTS IN ACCORDANCEWITH ED CAL IFORNIA'U9T 3. EXCAYATE A5 NECESSARY FOR THE INSTALLATION OF TANKS. PRESSURE FROf I PRODUCT LINES AND AIR FROM.SECONDARY LINES AFTER U '�
<br /> CONTRACTOR
<br /> CERTIFIGA7E8 SHALL PI PROVIDED TO ON CH I -A-
<br /> PAYING I$ IN PLACE
<br /> CONTRACTOR SHALL COMPLETE THE PIPING.IN$TALLATION CHECKLIST 4. CpN1RACTCR SHALL STOCKPILE EXCAVATED 501E FOROFFNAUL OR REUSE
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST 70
<br /> BY OTHERS. -II. , PERFORM PRECI810N TEST ON PRODUCT LINES AFTER PAVING er
<br /> OWNER 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE, PRECISION
<br /> 5. INSTALL 'TYPAR".FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PER LINE TEST $HALL. BE' IN ACCORDANCE WITH NFPA 328, LOCAL
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED ANp-CERTIFIED' BY THE TANK DRAWING$„WHERE REQUIRED BY.WET-HOLE CONDITIONS. TANK HOLD-DOWN5 ' : REAUIREI`1ENT$,OR'APPROVEQ EQUAL, TEST SHALL BE CONDUCTED BY A
<br /> MANUFACTURER IN CORRECT TANK:INWALLATION IN ACCORDANCE WITH IS84 ARE NOT REQ11IREp. - -
<br /> CERTIFIED TESTER' G.G. SHALL PROVI,pe WRITTEN-REPORT OF PRECISION
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO •' TEST TO OWNERS REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF
<br /> OWNER' CONTRACTOR 8HALL.COMPLETE THE .TANK. INSTALLATION C14ECKL15T 6. INSTALL (2) - 15,000 GALLON TANKS PER DRAWINGS AND CURRENT PROJECT,'
<br /> 6UPPLIED TANK MANUFACTURER AND 61-IALL FUR7NISH THE CHECKLIST TO MANUFACTURER'S IN6TRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL TIMES,
<br /> OWNER AND SHALL HAVE PRECII OVER OTHER INSTRUCTIONS MANUFACTURER'S 12, CONTRACTOR SHALL PROVIDE DOCUMENTATION OFA DYNAMIC BACKPRESSURE
<br /> -. CHECKLISTS $HALL BE C01I BY THE CONTRACTOR AS EACH STEP TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS.
<br /> 4. CONTRACTOR;TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK IS COMPLETED.: •TANK BEDDING AND BACKFILL TO RE PEA GRAVEL. TANK "
<br /> INSTALLATION PRIOR TO THE START OF WORK
<br /> CONTRACTOR WILL CONDUCT WEEKLY JOB. SITE SAFETY MEETINGS WITH IT'S SHALL 8 ANY OTHER TESTING AS REQUIRED BY LOCAL • '
<br /> BURY 19 TO BE MINIMUM 5 FEET, TANK BEDDING 15 TO BE'A MINIMUM 12'. )3, CONTRACTOR ,
<br /> TANK BNALL CONFORM TO MIANUFAGTURER'9 REGULATIDN9 FOR THE SYSTEM TYPE INSTALLED. - ;•'
<br /> .: EMPLOYEES AND THE MEETING MINUTES WIL.G: BE SUPPLIED TO OWNER REQUIREMENTS:
<br /> 5. CON7RAC70R $HALL HAVE THE FOLLOWING,I.IGENbES: 1. INSTALL £QUIPM I4, INSTALL PROTECTIVE BOLLARDS AS BH,OWN ONDRAWINGS.
<br /> A. GENERAL, ENGINEERING A < IN5TALL ALL OTHER EQUIPMENT A8 REQUIRED TO PROVIDE A COMPLETE 15. BRAVO,5OXES, tURBINE' $UMP'�S,"ANFi OVE ILL BOXES ARE TO BE
<br /> ENT AS LISTED IN OWNERS EQUIPMENT LIST, AND PROVIDE `
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING ("HAZ-9 PETROLEUh^ SYSTEM. , : COMPLETELY 6EALEp_ANi7 WATER.TESTED,,AS EVIDENCED BY OWNERS
<br /> C REPRE6ENTAtjVE A8 FOLLOWS,
<br /> 6. CONTRACTOR $HALL HAVE THE FOLLOWINfi INSURANCE. CONTRACTOR SHALL S' PROVIDE AND INSTALL NEW PRODUCT; VENT, VAPOR, AND SECONDARY
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER CONTAINMENTS LINE6 PER DRAWINGS.- CURRENT MANUFACTURER'S I. FILL WITH WATER TO HIGHEST PENETRATION. I
<br /> AS "ADDITIONAL INSURED". INSTRUCTIONS,SHALL BE FOLLOWED'AT ALL TIMES, AND SHALL HAVE 2. SPRAY PAINT TOP OF WATER -
<br /> - PRECEDENCE OVER OTHER W5tR1CTION5. MANUFACTURER�6 CHECKLISTS , '
<br /> A. STATUTORY WORKt1AN9 COMPREHENSIVE LIABILITY SHALL BE COMPLETED BY THE CONTRACTOR; AS EACH STEP 18 COMPLETED. 16. PROVIDE. ! INSTALL PETROL PANELS;CONDUITS, WIRING 4 6EAL5 FOR PETROL
<br /> - $YSTEM9 !' CANOPY'LIGHTING. '
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMEINEP SINGLE A: " PRODUCT' PIPING, 2" PRIMARY, PIPING WITH$" CONTAINMENT c0
<br /> ,E'?N SYSTEM A5 ApPROYEP, BY.OWNER,ALL PIPING AND CONTAINMENT SYSTEMS 17. ALL CONDU)t IS TO.BE 3/4' (M{NRhUM).;
<br /> LIMIT OF NOT LESS THAN It000f000 PER OCCURRENCE'.FOR BODILY SHALL. BE UL APPROVED FOR 100%'METHANOL. CONTAINMENT SYSTEM SHALL
<br /> INJURY AND PROPERTY DAMAGE, - Be BY:THE SAME MANUFACTURER WITH THE 541-IE 6ERIE5 ADHESIVES 18. INSTALL MONITORING SYSTEM WITH ANNULAR PROBES, TURBINE 8UM.P
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED AND / OR FITTINGS. PROBE5,.AND TANK GAUGE, AND MONITOR CONTROL. PANEL IN BUILDING. Z
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY 15 . VENT / VAPOR PIPING,'' RED THREAD IIA AND RED THREAD II WITH 19. INSTALL NEW DISPENSERS, ANP CONSOLE AS INDICATED ON THE SITE PLAN,
<br /> OF NOT LESS THAN $1,000.000 PER OCCURRENCE FOR BODILY INJURY AND FITTINGS AND 1000 AND 5000 SERIES ADHESIVE, OR AMERON DUALOY PROJECT DRAWINGS, AND DESCRIBED IN THE OWNER'S EOUIPMENT LIST W_Q '
<br /> PROPERTY DAMAGE. 30f00L.WITH ALCOHOL FITTINGS AND RP48 ADHESIVE: 00 NOT MIX z u
<br /> 1. GENERAL CONTRACTOR. TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND MANUFACTURER'S MATERIALS. 20. INSTALL SITE LIGHTING AND ANY OtHER ITEMS. AN SHOWN ON THE DRAWINGS,
<br /> SERVICES NECESSARY FOjI OR REASONABLY INCIDENTAL TO THE C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN AS APPLICABLE.
<br /> ILLI
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR TRAINED BY MANUFACTURER 21. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS �
<br /> REQUIRED BY THE DRAWINGS'. INDICATED ON.611E PLAN CONCRETE SHALL HAVE A MINIMUM 0 -
<br /> D: 6TEEL PIPE, ALL METAL PIPING.SHALL BE BLACK IRON SCHEDULE COMFRE661YE:STRENGTH AT 25 DAYS or 3000 P$I. CONCRETE SHALL BE RN6.
<br /> S. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED 40, OR EXTRA. STRONG, GALVANIZED PIPE I6 NOT ALLOWED, FITTINGS NATURAL.GREY.
<br /> TO, THE STANDARDS OF THE FOLLOWING: SHALL BE 300 p5I MALLEABLE IRON. - N
<br /> 22. REPAIR AND / OR RE=PLACE A.C. PAVING AND BABE TO MATCH ORIGINAL IN x
<br /> UNIFORM FIRE GODS TSTA E: ALL STEEL PIPE BELOW GRAPE'16 TO BE DOUBLE WRAPPED WITH 20 AREAS DISTURBED BY WORK
<br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL -
<br /> AMERICAN PETROLEUM INSTITUTE (API) STTAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP, 23. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK
<br /> 0S-
<br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (AM) - SHALL BE DONE ON A TIME AND MATERIALS II RENTAL RECEIPTS, i
<br /> ® n
<br /> UNIFORM BUILDING COPE (UBC) F: ALL THREADED CONNECTIONS SHALL BE THREADED WI I4 SEALANT 5UBCONTRACTOR INVOICES; MATERIAL RECEIPTS, AND DAILY LABOR TIME
<br /> NATIONAL ELECTRIC CODE (NEC) WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL SHEETS 814ALL.BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND L
<br /> NATIONAL' FIRE PROTECTION AGENCY (NFPA) COMPATIBILITY WITH THE PIPING MATERIAL'USED, AND FOR USE WITH MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY.
<br /> UNDERWRITER'5 LABORATORIE6; INC (UL PETROLEUM SOLVENTS, FUELS, OILS; DIESEL, AND 1009P METHANOL, WHICH
<br /> CALIFORNIA COPE OR REGULATIONS (CCR),', SHALL BE VERIFIED BY CURRENT MANUFACTURER'$ PRODUCT DATA SHEET. O
<br /> LOCAL ORDINANCES - -
<br /> 9. PETROL• PERMITS TO BE SECURER BY OWNER. MISG. PERMITS, AS REQUIRED G: CONTRACTOR SHALI_ DEMONSTRATE TO OWNERS REPRESENTATIVE THAT --
<br /> ALL MATERIALS ARE NEW AND CONFORM TO ABOVE 8PECIFICATION6. �--
<br /> 6HALL BE SECURED BY CONTRACTOR, WHO IS RESPONSIBLE FOR
<br /> COMPLYING.WITH ALL PERMIT CONDITIONS:
<br /> 10. CONTRACTORSHALL VISIT SITE AND FAMILIARIZE HIMSELF OF
<br /> ALL EXISTING CONDITION$ PRIOR TO SUBMITTING HIS BID, V/
<br /> IL CONTRACTOR 6HALL PROTECT:ALL EXISTING FACILITIES TO
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR V
<br /> REPLACE TO.THE $ATI5FACTION OF THE OWNERS REPRESENTATIVE ANY Z -
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S
<br /> OPERAtIONB..
<br /> 12. ALL EXCAVATIONS SHALL BE PERFORMED:IN COMPLIANCE WITH OSHA AND - gg � 99
<br /> $TATE REGULATIONS, THE CONTRACTOR 18 REFERRED TO THE OSHA 3-l_t z
<br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WOfI - -.'LL
<br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK, _ yyU
<br /> 13. UPON COMPLETION OF PROJECT; CONTRACTOR 6HALL PROVIDE OWNER WITH
<br /> B7.lILTr`ORAWING6'OF ALL ITEMS INSTALLED BY SAME. "AS BUILTB' - O (]
<br /> - 9NALL BE COMPLETED ON-SITE WITH lu
<br /> INFORMATION NOTED DIRECTLY ON "-" L_
<br /> f _ APPROVED JOB COPY. ,¢s°�eH MOR4,FESSZ
<br /> ��c _1
<br /> 14. CONTRACTOR SHALL PROVIDE L18T OF SUB-CONTRACTORS, IF ANY, WHO
<br /> WILL BE USED ON THE PROJECT. N0.2500 y SHEET #
<br /> ^ = EXP.3-31�0y'
<br /> 15. CONTRACTOR SHALL COORDNAT£ ALL INSPECTIONS AND APPROVALS AND
<br /> r 1 OBTAIN; AT THE COMPLETION OF'THE PROJECT, ALL CERTIFICATESuo-
<br /> ,SrAuoruP°'TP
<br /> 1 REQUIRED TO.OPERATE.THE FACILITY. greC oP
<br /> 2663'
<br /> s