My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
BILLING_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:30 AM
Creation date
11/6/2018 9:28:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2009 - 2015
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\18754\PR0507164\BILLING 2009 - 2015 .PDF
QuestysFileName
BILLING 2009 - 2015
QuestysRecordDate
1/17/2017 10:02:48 PM
QuestysRecordID
3312742
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah <br /> UNIFIED PROGRAM CONSOLIDATED FORMw <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490'' <br /> • PLAN TYPE [ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490¢ <br /> (Check one Hem only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACUXrY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME)^,r11Gtn �GS <br /> BUSINESS SITE ADDRESS / " ;5 ,.y H c �w,_ 7_ 103. CITY_. � 5w. <br /> r <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must berformed <br /> ?3 CCR§2632,2634,2638 2641 Pe by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED [:]'l.ANNUALLY ❑ 99.OTHER(Specify): 490.34 <br /> 490.36 <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49aa <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTTITAL)SPACE(S)OR SECONDARY CONTAINMENT 49x-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL YARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: EN a DRY ❑ b.LIQUID FILLED ❑ C.PRESSURIZED ❑d.UNDER VACUUM 49 <br /> PANEL MANUFACTURER: ' r\% 1>t•! r�.. i 3 490.]. MODEL -; - 4904 <br /> LEAK SENSOR MANUFACTURER: - 1 :- !-.�.'�' 49°'9_ MODEL#(S): ._ <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: 490.12 MODEL#: 490.53 <br /> IN-TANK PROBE MANUFACTURER: 490.14 MODEL#(S): 49°u <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAI,YINGHTLY ❑ c.WEEKLY 490'16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49453 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> • ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490'31 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49av <br /> 9o-:4 <br /> TEST FREQUENCY: 51 a.ANNUALLY [3b.BIENNIALLY ❑ c.OTHER(Specify): 4 <br /> 490.2 <br /> (g99.OTHER (Specify): (4P r.., ,lt it 1 1. ;. ' �,i y :�. `. " T u °26 <br /> V.PIPE MONITORING S PERFORMED US G THE FOLLOWING METHOD(S)(Check all that apply) <br /> CR 1.CONTINUOUS MONITORING OF PlPEI PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:W DRY ❑b.LIQUID FILLED [3c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER �/)rr C Z.' i;� .}' 490.30 MODEL#: L2 -i j U r9a31 <br /> LEAK SENSOR MANUFACTURER: �:1 °90x3 MODEL#(S): 3 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. qa.YES ❑b.NO ° <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. aa.YES ❑b.NO 49 31 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTSt4�3 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR <br /> MLLD MANUFACTURER(S): �':•. .-•/ j 49x33 MODEL#(S): -❑ 3.ELECTRONIC LINE LEAK DETECT (ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.L LEAK TESTS (23 CCR§2636) <br /> ELLD MANUFACTURER(S) 49440. MODEL#(S): <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO <br /> 4.PIPE INTEGRITY TESTING 49645 <br /> TEST FREQUENCY 0 a ANNUALLY 0 b.EVERY 3 YEARS Cj c.OTHERS i 4964649647 <br /> 5.VISUAL PIPE MONITORING. 49646 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY E c.MIN.MONTHLY R EACH 7iME SYSTEM O(ERATED• t 49049 <br /> 'AlbvaJbr. of-Mw mvu Id i' W HSC 25ffiLs .AP ', ' ' P �� ^dr�..'rD/ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)1. f I 49050 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 490.52 <br /> • 490.33 <br /> {7PGGfiI6T-'D('12Y2007)YAt <br />
The URL can be used to link to this page
Your browser does not support the video tag.