Laserfiche WebLink
1 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT MDQ MONITORING <br /> • 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4s Ra <br /> I.CONTINUOUS ELECTRONIC MONITORING ❑I FLOAT AND CHAIN ASSEMBLY 9 3.ELECTRONIC STAND-ALONE 45ar4b <br /> ❑4.NO DISPENSERS ❑99.OTHER S <br /> PANEL MANUFACTURER: V l e t i w ery °sass MODEL p: - / r' .+�— 1 49as6. <br /> LEAK SENSOR MANUFACTURER L Z �( - ft, ., 49097 MODEL,#(S): '� <br /> DETECTION OF A LEAK INTO THIN UDC TRIGGERS AUDIBLE AND VISUAL ALARMS s9 <br /> ❑ a YES ❑.b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUFDOWN (9 a.YES ❑b.NO 4�, <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Q a YES ❑b.NO 4�1 <br /> UDC MONITORING STOPS FLOW OF PRODUCT AT THE DISPENSER Q a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS 1.SINGLE-WALLED ❑2.DOUBLE-WALLED °i <br /> IF DOUBLE WALLED: 49 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: Q 1.LIQUID 1712.PRESSURE 0 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 49a64b <br /> VII.PERIODIC SYSTEM TESTING <br /> Lj t. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THIN STATE WATER RESOURCES CONTROL BOARD THAT ENHAbL= 490.69, <br /> K D N MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> J2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br /> 3.SPILL•BUCKETS ARE TESTED ANNUALLY. 497 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> [Alarm logs 49 Ra ❑Visual Inspection Records 49 b gTank integrity testing results 49a6ac <br /> SIR testing results(and supporting documentation records). 4"d ❑ Tank gauging results(and supporting documentatio;r=ord&s):. 4�:e: <br /> ATG Testing results(and supporting documentation records).49or:sr ❑ Corrosion Protection 60-day logs 49 s <br /> Equipment maintenance and calibration records. 49 M <br /> UL TRAINING <br /> faPersomtel with UST monitoring responsibilities are familiar with all of the following documents relevant m the rjob duties. 4 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACUM(Check all that apply) <br /> • IR THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Regi¢red)49a69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49a69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49 % <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o�69e <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49CO-W <br /> SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.69s <br /> OTHER(Specify):m69n ht 9 • f ., Ai".0 u . - 7 � f z n I o <br /> Uff This facility has a"Designated UST , for who has passed the Cal'omia UST S r <br /> The"Designated UST Operator'will train facilityemployees in the System Operator Exam admin' by the Nand within <br /> 3 Council(ICC). <br /> p proper operation and maintenance of the UST systems annually,and witlthr 30 days of hire.This <br /> training will include,but isnot limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employce's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact persons)for emergencies and monitoring alarms.49a70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional _ A,or' i to how many papas with itional i o 'an(�on specific monitoring pFoced m this plan.49071 <br /> pV(�S ^'Wt t 'i�•'Y1,1M.. In 6 DILL fA�' �ILtrL. 9 1 s <br /> M.PERSONNEL RESPONSEaEUTIES <br /> The UST Owner/Operator is responsible for ensuring that 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME �<-:r ,brr 0 r, 49an TITLE C',.,"^t r <br /> 49an <br /> NAME t,4'� 3!1 r.-3 I 49 74 TITLE p^< '..:: 49a75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report in the owner/o tor, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTWCATION:I cedify that the information provided herein is tree and accurate to the best of my knowledge. <br /> APPL( ANT SIGN'131RE 490.76 DATE: 4W77 <br /> F Try amt 'v <br /> �AN <br /> APP C NAME :, °9p'18 APPLICANT TITLE: <br /> E490'm <br /> (P.I t) <br /> r- LllZ, rd' <br /> URCFu� a(�7/24a41u4Vj <br /> c� r /Zrzpd / <br /> Pec(r 1 <br />