My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TADDEI
>
381
>
2300 - Underground Storage Tank Program
>
PR0502400
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:40:38 PM
Creation date
11/6/2018 9:45:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0502400
PE
2381
FACILITY_ID
FA0005432
FACILITY_NAME
LODI CONCRETE PIPE SERVICE
STREET_NUMBER
381
Direction
W
STREET_NAME
TADDEI
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
381 W TADDEI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TADDEI\381\PR0502400\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
10/19/2017 7:10:48 PM
QuestysRecordID
3691174
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! SAN a0AQUI N LOQ" AT • HEA11,rH DI S IRI CT <br />SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br />he following represents minimum sampling criterion required for closure compliance. Soil <br />samples collected shall be representative of native soils beneath the tank's <br />invert [tank's bottom] at a collection depth not be exceed 2 - 9 feet. If contamination <br />is documentedSdurinLHD vithosurein 5 daan Unauthorizection 2652elCCRe notification must be filled out and <br />ted <br />WATER NOT PRESENT IN THE TANK PIT -- - -- --- — <br />TANK SIZE IMIN <br />Less than 1000 gallons <br />1000 - 10,000 gallons <br />10,001 gallons and up <br />Piping <br />OF I LOCATION OF SOIL SAMPLES <br />ONE per tank. <br />TWO per tank <br />THREE OR MORE <br />per tank <br />0 <br />Fill or pump end of tank <br />One at each end of tank <br />Ends and Middle or <br />generally spaced along <br />the length of the tank <br />EVERY 20 LINEAL FEET <br />WATER IS PRESENT IN TANK PIT <br />TANK SIZE <br />MINIMUM NO. OF <br />SOIL SAMPLES <br />LOCATION OF SOIL <br />SAMPLES <br />MINIMUM NUMBER <br />OF WATER SAMPLES <br />10,000 GALLONS <br />—� <br />From wall next to <br />tank ends at soil/ <br />OR LESS <br />(Single Tank) <br />TWO <br />groundwater <br />ONE <br />interface <br />GREATER THAN <br />From wall next to <br />ONE <br />10,000 GALLONS <br />tank ends at soil/ <br />OR <br />groundwater <br />TANK CLUSTER <br />FOUR <br />interface <br />OTHER SPECIAL CONDI TIONS <br />SLAB PRESENT IN TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through <br />obstruuction willwthenballow sampling acccording to the <br />removal of the <br />TANK SIZE _ MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br />SOIL SAMPLES <br />Less than 1000 gallons THREE per tank Center and ends or sides <br />1000 - 10,000 gallons FIVE per tank Center and ends or sides <br />10,001 gallons and up FIVE OR MORE per Ends and Middle and <br />tankgenerally spaced along <br />the length of the tank <br />EH 23 047 12/88 <br />REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.