My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TEEPEE
>
2735
>
2300 - Underground Storage Tank Program
>
PR0232567
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:57:17 PM
Creation date
11/6/2018 9:51:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0232567
PE
2381
FACILITY_ID
FA0003660
FACILITY_NAME
ELESCO
STREET_NUMBER
2735
STREET_NAME
TEEPEE
STREET_TYPE
DR
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2735 TEEPEE DR STE A
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TEEPEE\2735\PR0232567\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/28/2016 12:01:15 AM
QuestysRecordID
3098536
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'%WW STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. .d c <br /> FARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT °4vo <br /> ITEMO 2 INTERIM PERMIT 5 CHANGE OF INFORMATION O 7 PERMANENTLY CLOSED ONSITE <br /> ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE <br /> ❑ e TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 5 <br /> 73 ,5- iv, leew e ve. <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D. <br /> B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAV/YEAR) <br /> D. TANK CAPACITY IN GALLONS: <br /> II.TANKCONTENTS IFA-11S MARKED,COMP TE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL 4 OIL B. C ❑ 1a REGULARo 3 DIESEL <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ❑ ;-PRODUCT UM UNLEADED <br /> EO 4 GASAHOL ❑ 6 AVIATION GAS <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN 2 1DI <br /> ASTE ❑ UN ADED ❑ 5 JETFUEL ❑ 7 METHANOL <br /> ❑ 2 LEADED O gg OTHER (DESCRIBE IN ITEM OW( <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED D. BEL_ <br /> C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINEA LAr <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 95 UNKNOWN <br /> 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS <br /> ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE 7 UMINUM <br /> (PrimaryTank) ❑ 9 BRONZE ❑ / El 100x METHANOL COMPATIBLE W/FRP <br /> ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 E XY LINING <br /> ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> LINING ❑ 5 GLASS LINING ❑ 8 UNLINED 5 UNKNOWN <br /> ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 L ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> WRAP <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 5 UNKNOWN ❑ 99 OTHER <br /> E.SPILL ANDOVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFASOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U UNKNOWN <br /> A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A J A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ <br /> MONRORING ❑N OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 DOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORINGLo 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE( <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY# JURISDICTION# ITV# TANK# #TO <br /> A <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE1T EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FOROBi1&RS <br />
The URL can be used to link to this page
Your browser does not support the video tag.