My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15250
>
2300 - Underground Storage Tank Program
>
PR0537919
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 2:54:52 PM
Creation date
11/6/2018 10:01:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0537919
PE
2351
FACILITY_ID
FA0021886
FACILITY_NAME
Love's Travel Stop #538
STREET_NUMBER
15250
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
15250 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\15250\PR0537919\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/12/2017 5:35:13 PM
QuestysRecordID
3497454
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•UNIFIED PROGRAM CONSOLIDATED FOI& <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® L MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 0Y°-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(.S)- <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ _ I <br /> BUSINESS NAME(Same as FACILITY NAME)Loves Travel Stop#538 3. <br /> BUSINESS SITE ADDRESS 15250 North Thornton Road Ina_ CITY Lodi 104 <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§263212634.2638,2641) ---------------------------------------- <br /> ____-,_-____,________-___ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490 3b <br /> IH.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. [12.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ------------------- ----------------------------- ___-_ _ ______"_"_______"_"__""_"__"__"__________ <br /> PANEL MANUFACTURER: Veeder-Root 490-2 MODEL 4: TLS-350 490"8 <br /> __ _ <br /> __ ___-_-_--__-__-__-___________--_---____-__--___-___--------------__-- _ __-_"__"__"__"__"_"_"__""_____"________-_ <br /> LEAK SENSOR MANUFACTURER: Veeder-Root - MODEL#(S): 794380-303 <br /> 4911-9 49Ri9 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 4901 I <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ____'_______-_---_-_-----------------_--_ <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ..__..-___.-_._._____________""_____"_____""--------------------_-__-_____--__-_---_----_ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> __________-____-___--__-_--_______-_--__-_--_"__"__"_"_""_"____"__"__"__"___-__________""_"_"____"_______""____"_"___"__"__"_"__"__"____"__"_____-_-_________-----_-----------------_-_-_ <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490 188 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 90-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PEPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49°-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ®d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER:Veeder-Root 490"30 i MODEL#: TLS-350 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490x2 i MODEL#(S): 857280-100 490-33 <br /> -_-----_-------------------------------------------_---_--------------- <br /> ___-________-"-_____._____"_____"__"__"__"__""____""_"__"__""_-____________ <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-4 <br /> FAR.UREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) _ 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> 490-4n. <br /> ---------------------------------- --- <br /> HELD MANUFACTURER(S)Veeder-Root MODEL#(S): PLLD 848480-001 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. <br /> MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> 'Allowed for monitoone of unburied emergemy gewraor fuel pipmg only er HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-5I <br /> ❑ <br /> 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(1212007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.