Laserfiche WebLink
ENVIRONMENTAL AGE ENERGY MINERALS <br />ANANIA GEOLOGIC ENGINEERING <br />RAINBO BAKING COMPANY'S <br />PERMANENT CLOSURE OF 10,000 GALLON UNDERGROUND FUEL <br />STORAGE TANK AT THE 906 TOMMYDON FACILITY <br />IN STOCKTON, CALIFORNIA <br />November 18, 1988 <br />AGE Project No. 025-88-068 <br />Rainbo Baking Company has complied with all of the permanent closure requirements for <br />underground storage tanks in accordance with Title 26, Division 23, Section 2672 of the <br />California Code of Regulations. The tank was removed on September 30, 1988, by Franklin <br />Maintenance & Equipment Company. A tank closure permit and disposal certificate were <br />filed with the San Joaquin County Local Health District (Attachment A). The excavation <br />appeared clean with no perceptable soil discoloration and only a very slight odor of gasoline <br />was present. Soil types in the excavation included silty sand and clay layers. There were <br />no indications of leaks. <br />In compliance with local regulatory guidelines, two grab soil samples were taken from the <br />backhoe bucket excavated from each end of the tank, approximately two feet below the <br />excavation bottom. The samples were placed in glass jars, labelled, and transported in an <br />iced container under proper chain of custody protocol, to ANLAB, a California Department <br />of Health Services certified laboratory. Copies of the analytical results, chain of custody <br />record, sample location map and tank excavation form are included as Attachment B. <br />The samples were analyzed for benzene, toluene, xylene and ethyl benzene by EPA Method <br />8020, total petroleum hydrocarbons (TPH) by EPA Modified Method 8015, and total lead. <br />The certified analytical results show soil in the vicinity of the tank is clean. TPH <br />concentrations were not detected at levels above 10 parts per million (ppm) and total lead <br />concentrations were reported as 13 and 16 ppm. The sample from the north end of the <br />tank excavation (Tank 1A) had less than 0.03 ppm benzene, 0.12 ppm ethyl benzene, 0.04 <br />ppm toluene and 0.35 ppm xylene detected. The sample from the south end of the tank <br />excavation (Tank 113) had concentrations of less than 0.03 ppm benzene, ethyl benzene, <br />toluene and xylene. Based on the analytical results, no further action is required at this <br />site. <br />Prepared by: <br />A Date: 11 elle <br />Mary Scruggs, 64logist and Project Manager <br />I hereby certify that the above described work was performed under my direct supervision. <br />In addition, the soil in the vicirij.€ orementioned underground fuel tank at the <br />Tommydon facility, requires f(Wty�tlb!�e based upon the analytical results reported <br />herein. <br />Certified by: <br />AGE <br />Date: <br />144735THS�E��(O�,LI FOR N I A. 95816 PHONE(916)451-0921 <br />