Laserfiche WebLink
'RD OF TRUSTEES <br />as Culbwtson. Pru. <br />icle E. Vannuccl, Sac -y. <br />hOnatts Van Spronsan <br />i Plmantal <br />M Bugbee <br />Nal L. Floras <br />+n D. Meat, M.D. <br />Ilam J. Wada <br />ry Anna Lova <br />Facility Name <br />Address <br />SAN JU%UIN LOCAL HEALTH DISTRICT <br />1601 East Harelton Avenue, P. 0. Box 200§ <br />Stockton, Callfornla 95201 <br />209/466-6781 - <br />Jogi Khanna, MA. M.P.H., District Health Officer <br />rac <br />3LAI <br />Date of Inspection <br />MONITORING ALTERNATIVE #7 <br />I Yk t`. '�)- cn. <br />Inspector <br />SERVING <br />Clly of Lodi <br />San Joaquin County <br />City of Escalon <br />-City of Mantoca <br />City of Ripon <br />City of Stockton <br />Caty of Tracy <br />San Joaquin County <br />Sen Joaquin County <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the liquidlevel in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />{/Annual precision test on tank and piping, <br />k gauging performed as follows: <br />Tank must be capable of being secured tor <br />withdrawals. P event unauthorized inputs and <br />~-�Tank must have no inputs or withdrawals for at least a 48 houreriod <br />(.2 days) at the end of consecutive periods lasting up to 7 days• <br />r (For example: tank in use Monday through Friday, then locked <br />c' over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect.- 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by 3— q—Z-7 <br />office within 30 days of the test. `� ^r and results submitted to this <br />Tank gauging must be started immediately. (See instructions above <br />t/ . ) <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />ate. <br />/86 UGT 3 <br />