1 2 3 4 6 s 7 s 19 10 n 12 13 14 15 16 17 1s
<br /> 01 GENERAL REQUIREMENTS Suction System - Open check valve, pull popvet and drain product from line into tank. ALTERNATIVE BACKFILL MATERIALS: Defined as any material not meeting above requirements SPECIAL FITTINGS. The shut-of( valve ("Shear" or "Safety" valve) at the base of the product pump
<br /> Do not replace poppet. Reinstall cover on valve. for approved materials. or dispenser is secured in position to the stabilizer bar of the dispenser containment box as etailed
<br /> on the drawings.
<br /> Pressure System- 'Break' pipe at union of remote pump. Drain product into tank or Approval of Company Representative is required prior to use of such material. In certain
<br /> 1 M These General Requirements apply to all sections of the specifications as if stated separately In each separate container, instances, the approval of the tank manufacturer may be required to preserve the tank warranty, Position the valve so that the line test port plug is accessible. M
<br /> section. Company shall obtain such approval.
<br /> � Avoid spills. Da not allow product to drain into soil. Contractor may be held liable if soil PIPE WRAPPING: All underground steel pipe and fittings shall be field, primed and wrapped.
<br /> COMPANY REPRESENTATIVE: The Regional Manager or Representative authorized by him, contamination occurs during tank and line removal. Alternate materials, if used, must be dry and free of ice and snow. The tank hole sides must be Wrapping material shall be 35 mil polyethylene tape "Polyken 930 manufactured by the Kendall
<br /> shored or side sloped to permit entry for compaction and testing. Company or equal approved by Company Representative). Wra overlap shall be one-half width
<br /> hereinafter referred to in these specifications as Company Representative. pi ( q PP p Y P . ) D p
<br /> Flush all product, vent and vapor return lines back in tank or separate container(s). (Flushing of wrapping material. Wrap 1-1/2" and r fittings with Polyken 900 (12 mils) with a 60%
<br /> in separate containers can be dumped into product tanks for storage.) Flush each line with a overlap. In difficult areas Polyken 931 can be used before wrapping with Polyken 900. Primer
<br /> STATUS OF COMPANY'S REPRESENTATIVE: Company Representative has authority to make minimum of 10 gallons of water. BEDDING OF TANKS: A 1T minimum bed of backfill material is to be placed in the hole, sholl be Polyken 927 (above 40' F) or Polyken 919 (above 10' F).
<br /> all decisions regarding work performed under this contract. smoothed and sloped to allow a tank slope of 1" in 10' downward toward the fill end prior to
<br /> Open oil openings and flush inside of each tank with a minimum of 200 gaIte s of water using setting the tank. Exceptions: Do not wrap the union at the remote pump and/or FRP pipe/flex connector
<br /> nigh pressure spray equipment with wand to "wash down" the sides and bottom of the tank. connections.
<br /> WORK INCLUDED: All labor, material, utilities and equipment required for full performance and When specified, the hold or tie-down "logs shall be installed prior to be bed material.
<br /> completion of work herein specified or shown on accompanying drawings, including procurement Company Representative wit' arrange for a vacuum truck to collect all recovered product (liquid SETTING & BEDDING PIPE: A minimum bed of backfill material, equal to 2 1/2 times the pipe diameter,
<br /> P Pe g
<br /> - n t tanks on concrete sobs timbers beams cradles or rout the tanks in wet i I in 11 piping m h m n I d i material
<br /> of and payment for all necessary permits, sentles, etc. unless otherwise noted on the plans or and sludge), Vacuum truck is to return "recovered' product to "slop" at Company facility or Caution he of place t s o grout s to be paced a p p" g 5 oat co pact and slope bedding ng mater a
<br /> L specifications or specified by Company Representative approved treating facility with approved oil/water separator system. cement. The tank, whether lied dawn or not, must never be left on the bed without tank a backfill to allow a slope of 1/4 per foot toward the tanks. I_
<br /> to the top of the took if there is any chance of water, 12" or more above the tank bottom, in the 1/8 per fool may be used if approved in writing Com an Re resentative.
<br /> The tank must be free from flammable vapors prior to removal. One method is to remove all hole.
<br /> DOCUMENTS: Drawings and specifications are cooperative. Execute work indicated in one as if tank fixtures, except for the tank vent and place solid carbon dioxide (dry ice) in the tank, A SEE SECTION 07 FOR BACKFILL MATERIALS.
<br /> indicated in both. Work not detailed or specified must be some quality and type as work detailed minimum of 1,5 lbs per 100 gallons of tank capacity must be added. Plug a'1 tank openings
<br /> or specified. Contractor shall verify all dimensions and conditions on the site Report at once except the vent and allow the tank to vent. Piping shall over
<br /> placed o another pi prepared bed in such manner to minimize points at which one pipe
<br /> may cross ovpipes.
<br /> any discrepancies found between drawings, specifications and site conditions for adjustment by 03 PRODUCT, VENT & VAPOR RECOVERY PIPING pe. At points where piping must cross over, a minimum of 2 1/2" must
<br /> separate the
<br /> Company Representative before starting work in question, Under no circumstances should work After tank venting, the vapor space shall be tested by placing the combustible gas indicator probe
<br /> in question be started if a •discrepancy Is discovered alter award of Contract. Terms of contract into the fill opening with the drop tube removed. Readings should be token at the bottom, When piping is placed on the bed, proceed to "First Test" (below) prior to backfilling trenches.
<br /> apply to this work. Contractor to keep a complete set of drawings and specifications and any middle and upper portions of the tank The tank atmosphere must be 20% or less of the lower
<br /> n documents on theob at all times. When the word PROVIDE is used on flammable limit riot to removal. Refer to the probe manufacturer's instructions for testing In MATERIALS: All pipes, fittings, risers, wrapping materials, etc., shall be furnished and installed CLEANING SOLVENTS' Remove any accumulation or accidental spill of pipe cleaning solvents on
<br /> pmtment supplemental 0 1 P b the Contractor. Specific materiels noted in this specification and/or on plans will be
<br /> drawings or In specifications, it shalt be taken to mean "Furnish and Install" low oxygen conditions. Y D P / P the tank immediately with a clean cloth. After the piping is completed, inspect the containment
<br /> furnished by Company. sump and other collection points for piping cleaning solvents. Contractor wit) be responsible for
<br /> Prior to removal, all tank openings should be plugged. One plug should have a 1/8" vent holeany damage to tank resulting from on accumulation of pipe cleaning solvent If
<br /> K LAWS, CODES, ORDINANCES AND REGULATIONS: Lows, Codes, Ordinances and Regulations to prevent excessive pressure buildup. This vent hole must face upward at all times. All pipe runs ore to be of "fiberglass" pipe and sized in accordance with plans. K
<br /> which apply to this work must be rigidly followed. Determine handling of any variations REPAIR OF PIPING. Replace any damaged piping immediately. Repair of piping using field cul
<br /> between plans or specifications and governing ordinances, etc., with Company Representative Plug any corrosion caused holes using screwed boiler plugs, Company Representative will inspect Fiaz connectors are to be used at the vent riser base and dispenser base piping connections, half section of pipe is not acceptable. If approved by Compony Representative, repair using
<br /> before starting work the removed tanks, then release the tanks for shipment. Above round vent riser Is to be galvanized steel e. manufacturer supplied pipe fittings and procedures is acceptable. Repaired pipe requires
<br /> 9 9 pipe. complete testing or retest using procedures below.
<br /> All U.L. Labels shall be removed and given to the Company Representative,
<br /> PRECAUTIONS: Protect adjoining properly. ,earlhwork, trees, etc., from damage and give proper Back ron pipe and/or liftings shall be used with diesel fuel. Do not use gglvonixed pipe or fittings SECONDARY CONTAINMENT FITTINGS: Two piece fittings require more adhesive than normal
<br /> written notice of proposed work to adjoining properly owners. Repair any domoge to adjoining All tanks must be properly lobeled prior to transportation from the site. Transport and disposal with diesel ue ball and spigot joints. Two 7/16 " wrenches or a variable torque impact wrench is required to
<br /> properties caused by this operation to satisfaction. of Company Representative. Protect completed of the tanks and product lines must be done in accordance with all state and local regulations, tighten the fittings, Make sure adhesive fills all gaps between pipe ends and fitting sockets,
<br /> work from damage until accepted by Company Representative. 1. FIBERGLASS PIPE: Pipe and fittings to of UL approved for petroleum and alcohol fuels, non-
<br /> Follow any Stale or local regulations regarding Soil samples or inspection of tank hole and/or metallic, for underground piping of petroleum products. All pipe will have bell and spigot joints. FLEX CONNECTOR BOOTS Encase all flex connectors when in contact with soil in an isolation
<br /> ' looks. All product piping will have secondary containment Vent and vapor recovery piping do not require boot. Move the isolation boot to inspect and test all primary piping and flex connector.
<br /> MATERIAL: To benew, purchased locally if possible, and of brand herein specified Brands and secondary containment unless specified elsewhere.
<br /> ggrodes specified ore approved and included to establish type and quality requirements. If When free product is found during any phase of the removal of underground tanks) or. piping - TESTING OF PIPING: Notify the Company Representative, who MUST observe all tests, at least
<br /> J Contractor would prefer to substitute brands and grades that ore equal to those specified, system(s), immediately notify the Company Representative, Approved Fiberglass Pipe: 24 hours in advance of ony tests. Contractor to coordinate testing with local inspectors and
<br /> information on proposed substitutions must be submitted to Company Representative prior to Company Representative,
<br /> procurement to determine acceptability to Company. EXCAVATIONS Excavate only to the depths required by the plans, or as instructed by Company Ameron
<br /> Representative. Dooley - 3000/L Pipe System The Contractor Is responsible for oil labor, materia', and equipment to conduct pressure tests (air
<br /> SUPERVISION AND COORDINATION: General Contractor Is responsible for progress, execution If unexpected water condition or rock Is encountered, immediately contact the Company Smith Fiberglass, Inc. or hydrostatic) of all product, vent and vapor recovery piping.
<br /> and quality of Subcontractor's work and is to coordinate and expedite procurement of materials Representative for instructions before proceeding with the excovotion, Red Thread II Pipe System TESTING DEVIATIONS: Do not deviate from the following testing procedures. Perform alternate
<br /> and performance of work of respective trades and Subcontractors. General Contractor to hove testing procedures required by local inspectors after Chevron tests are completed and
<br /> the some qualified responsible representative who understands and speaks English fluently on the TANK HOLE SIZE IN STABLE SOIL Size excavation perimeter to allow 24" minimum between Adhesives for Primary Product Piping Adhesives for Vent, Vapor, and Secondary Containment Piping documented.
<br /> job at all times, including time of final inspection. General Contractor is responsible for tanks and 24" minimum between tank sides and end caps and the wall of the lank hole. DS-8014 (Must be Heat Packed) OS-7069
<br /> establishingg and maintaining oil lines, levels and grades shown on plans or otherwise required DS-6069 1. FIRST TEST (Prior to Back Filling Pipe Trenches): Do not connect piping to tanks, remote
<br /> General Coniraclor to maintain site in accessible condition for other trades and contractors, TANK HOLE SIZE IN UNSTABLE SOIL' Unstable soil is defined as having less than 750 lbs,/sq. Non-metallic fittings are to be those manufactured by the supplier of the pipe being used. is tested
<br /> ft,
<br /> dispensers. Do not seal or install secondary containment liftings until primary piping
<br /> ft. cohesion, as calculated from an unconfined compression test, or soils with on ultimate bearing
<br /> H RESPONSIBILITY: The Contractor accepts full responsibility for proper handling and inslailotlon capacity of less than 3,500 lbs,/sq.lt. Loose sand, muck, bog, pool, swomp or landfill where sod Install primary and secondary pipe and fittings in accordance with the manufacturer's instructions. Test the entire piping system, i.e., product, vent secondary containment and vapor recovery H
<br /> of the fiberglass reinforced plastic (FRP) or composite underground tanks and FRP piping, and is soft are generally considered unstable soils (where applicable), In accordance with the following procedure.
<br /> 2. STEEL PIPE: (Galvanized or Black Iron)
<br /> shall ensure that good workmanship, practices and construction procedures ore followed during
<br /> the handling and installation of the tanks and piping. Size excavation perimeter to allow 24" minimumbetween tanks and a minimum of half the lank
<br /> diameter between the tank sides/end cops and the wall of the tank hole. Schedule 40 (ASTM A-120) Steel Pipe SteOne: Install pressure application system that includes two pressure gouges (15
<br /> Step
<br /> The Contractor is responsible for inspection of the tanks for damage upon receipt of the job site. 300 x Railroad Unions psi maximum) Apply pressure air 10 psi into the piping system.
<br /> Nate any visible damage on the delivery receipt. Filter fabric At be used to tine tank hole for FRP tanks in unstable soil. 150 Molleable Iron Fittings Soap alltaints using approved soap solution.
<br /> The presence of the Company Representative onsite does not relieve the Contractor of the Permanent shoring may be used to stabilize the walls of the tank hole, at the discretion of the Do not use standard couplings typically furnished with the pipe, Carefully observe each joint for evidence of leaks.
<br /> responsibility for proper tank handling. Installation, and safety measures, Contractor and/orCompany Representative, if permanent shoring is used, follow "Stable Soil" Step Two: Prplect area around piping systems to prevent workmen, passers-by, etc.,
<br /> size criteria Refer to Alternate Bocksill Moteriats; below. FIANDLINO OF PIPE & FITTINGS: All piping installations shall conform to pipe monufaclurar's from entry. Install pressure cppllcotion system that includes two pressure gauges (150
<br /> specifications and installotlon guidelines, psi maximum) Apply 100 psi pressure to each piping system, hold for one minute,
<br /> TESTING AND INSPECTION: The nature and type of tests and/or inspections to be conducted, in - release pressure. Repeat for five cycles.
<br /> addition to those specifically coiled for on the "plans or in the specifications, will be listed by DEPTH OF TANK HOLE. Contractor is responsible for establishing the tank hole depth, considering 1. FIBERGLASS PIPE: Careful handling of piping is critical. Protect piping against abrasion
<br /> CA Company Representative under "Scope of Work. The cost of such tests will be paid by the the length of piping runs, to the pump blocks and vent risers, pipe, burial depth, yord slope and from sharp or hard objects: impact domoge from improper storage, transporting, laying- or Step Three: Repeat Step One. Q
<br /> Company.
<br /> the following criteria' (Measure at the Remote Pump opening). backfilling. Inspect all pipe for damage prior to installation in the piping system.
<br /> If the Company Representative determines, during the course of construction, that additional 1, A minimum of 12' of bockfill material is required under the Conks. 2. STEEL PIPE AND FITTINGS: Protect against damage to protective coating/wrapping. Record re lest results bt the Company-supplied forms. Company Representative's Orees Cowl of
<br /> p y p 9 9 P test is required. After obtaining such ppprovol, the Contractor shall backfill trenches to
<br /> inspections or testing, whether by Company Representative or a testing agency, are necessary, INSTALLATION REQUIREMENTS, Interior surface of oil g subgrade, following the requirements of SSection 02 and materials in Section 07,
<br /> the Contractor shall cooperate in making arrangements for such tests. If work in question has 2. FRP The minimum depth of cover Is 3'-0" and the maximum is 7'-0", pipe and fittings must be free from dirt
<br /> notet been Installed and questioned material is satisfactory, payment for the test shall be mode Composite: The minimum depth of cover is 1'-6" and the maximum Is 5'-0". scale, metal, fiberglass particles, etc, before connecting. 2. SECOND TEST (After seating secondary piping). Apply 10 psi to the secondary containment
<br /> by Company. If the moteriol is unsatisfactory, it shall be replaced at no additional cost to Product piping must be d p y / D system. Scop all joints using approved soap solutions.
<br /> Company, and the cost of the test shall be .paid by Contractor. 3. Pitch the product lines 1/4" loot from the pumpblacks toward the tanks. DD 9 pitched upward continuous) from tanks to risers o minimum of 1 4" per
<br /> foot. Traps or sags will not be permitted Group all piping and locate as shown on the plans. 3. THIRD TEST (After connecting pi ting to tanks but prior to bockfilling): Apply 45 psi pressure air
<br /> For work aiready Installed (which must be uncovered in order to be tested), if it is defective, the 4, Pilch the vent and vapor return lines 1/4" per foot toward the tanks. Lines are to be laid straight, using fittings for directional and elevation changes. Do
<br /> should be no pressure loss during the remainder o1 the construction.
<br /> o not exceed 50 psi) to tess stem. Keep pressure on all lines until
<br /> Contractor shall bear the expenses of such uncovering, testing, inspection and replacement of Tt Y paving is completed.
<br /> defective material or construction. If the work is not found defective, Contractor will be allowed 5, Minimum of 2 1/2 inch seporotion between clamshell fittings & pipe wall exterior for all
<br /> an increase in the contract price or on extension of the contract time, or both, directly fiberglass piping at cross-overs Minimum 6 1/2 inch separation Do not support piping with foreign objects, such as strops of wood, pipe, that may damage 4. FOURTH TEST (After Backfilling and Patch Paving) Applies to product lines after backfill P
<br /> P attributable to such uncovering, testing, etc. between libergloss piping in the trench, and the wells of the trench. piping, Use foam supports. and
<br /> patching of concrete islands, slobs, and yard paving is completed.
<br /> For bedding of piping runs and backfill of pipe trenches, refer to Section 02 and to subsequent Test lines using Petro Tito Hydrostatic Line Testing equipment or approved equal, Company
<br /> SAFETY: Contractor shall perform the work in accordance with safe practices, laking all reasonable SAFETY REQUIREMENT: No person shall enter o tank hole excavation below the 5 It deep level portions of this section. Representative to designate test fluid Test fluid shall be assigned product, diesel fuel, or water.
<br /> precautions to protect the Faculty and adjacent facilities, workmen and the public and providing, unless the walls ore shored or the sides sloped os prescribed by current OSHA regulations such as Contractor to comply fully with the Procedure Manual for the Operation of Line Tester
<br /> where reasonably necessary, barriers,, guards, temporary bridges, lights and watchmen While on 54 CFR 45894 and 29 CFR 1926,650, 651, and 652. No exceptions. State or local requirements CUTTING OF PIPE:
<br /> the remises of Company or its affiliates all of Company's safety rules shall be strictly observed, that are more restrictive than Company specifications are to be adhered to as though specified in Test pressure shall be 50 psi (mow.) 11 5 times operating pressure (1501 for a remote pump
<br /> P
<br /> fin - hacksaw I r n abrasive wheel n
<br /> In particular, smoking shall be limited to such locations and occasions as ore specion tly Campony specilicotions. The Contractor is responsible for arty design, materials, equipment, permits, 1. FIBERGLASS PIPE: Cut with a fine-toothed oc saw bade o o a s e ee o a system with an allowable tolerance of 0.010 gal/hr.
<br /> authorized in writing by Company, Contractor shall not perform or permit any act on the eta., ear shoring or Side sloping o holt circular power saw. Use a sow guide or "Wrap Around" To ensure o square cut end. Cul pipe
<br /> premises of Company or its affiliates which Involves a fire or explosion hazard, including end must be within 1/8" of square. Vent lines (no phase 11 vapor recovery):
<br /> welding, torch cutting and disposal of debris by burning, without prior written consent of FILL AND BACKFILL All fill material shall be of a granular nature, free from vegetation and
<br /> company. extraneous molerial. Company Representative shall inspect and approve the material before it 2. STEEL PIPE: Cut with a hand or power or power-operated pipe cutter, as in normal fitting Unless required by focal agency, no second test required.
<br /> is spread. Spread material in lifts not to exceed 12 inches and tamp thoroughly. When required practice.
<br /> E The contractor is responsible for certifying that employees and subcontractors are trained and by local code, General Contractor shall provide a compaction lest for certification of fill. Vent lines and vapor recovery piping (with phase II vapor recovery): E
<br /> certified in Hazardous Waste Operations and Emergency Response (HAZWOPER) in accordance TAPERING & REAMING: Toper all cut fiberglass mann pipe ends to ct pip degrees using one of the
<br /> with 29 CFR 1910.120. tapering toots available from the pipe manufacturer. Protect plpol during tapenng to reveal Contractor is responsible for vent and vapor recovery piping systems passing any locally
<br /> BALLAST' Use water as ballast under all conditions where ballast is required damage to pipe. The finish toper shot' be smooth, clean and free from surface defects. The imposed test requirements
<br /> WARNING! Tests indicate that prolonged or repeated exposure to petroleum substances, in liquid length of toper for 2" diameter pipe is 1-5/8" and for 3" diameter pipe is 1 -3/4". For other size
<br /> or vapor form, may be harmful Refer to Materiol Safety Dale Sheets for specific information pipe, consult pipe manufacturer's instructions,
<br /> on various petroleum products. DRY HOLE CONDITION-. Tanks, with bockfill to lop of tanks, must be ballasted if there is any
<br /> Q chance that surface or subsurface water will enter the tank hole to a depth of 23" of greater Steel pipe ends are to be reamed.
<br /> v1 above the bottom of the tanks
<br /> V Follow manufacturers precautions for fiberglass piping, resins, or solvents used in assembling the BONDING & ADHESIVE SYSTEMS (Fiberglass Pipe). All fiberglass pipe surfaces to be bonded
<br /> piping system. Caution - Do not ballast tanks until backfill is to lop of tanks. shall be cleaned with solvent supplied by pipe manufacturer If tapered section is wet or moist,
<br /> ti dry with propane torch - do not overheat or burn the pipe. If temperature is below 70' F (21' C),
<br /> E warm oil tapered surfaces prior to applying resin or use epoxy adhesive as recommended by the
<br /> d WET HOLE CONDITION: Attempt to 1.p *Dry manufacturer on all bell and spigot joints Mix adhesive thoroughly In accordance with
<br /> p pump weer from the took hole to maintain a D Hole 09 1 9 Y,
<br /> D 02 EXCAVATION AND BACKFILL Cond'inion" If unable to obtain o Dry Hole Condition, notify Company Representative who will manufacturer's instructions and apply to both surfaces. Insert the spigot end into the bell using D
<br /> determine the course of action Instill filler fabric, tie-down "logs' and bedding as specified a slight turning motion (one-half turn to a full turn is necessary) and push.
<br /> (Supplement to Construction Speclficolions) elsewhere Set tank in hole, parbolly fill with water until It sinks firmly on the bed, Use only
<br /> enouglh water to ballast lank unlit bockfill Is to lop a1 tank. After backfill to top of tank, fell Apply pressure until mechanical lock is achieved Maintain bock oxii pressure on ail previously 9
<br /> tank with water until completion of installation, assembled joints to reduce .the chance of separation.
<br /> REMOVAL OF EXISTING TANKS AND PIPING SYSTEMS: Contractor will furnish permits, labor
<br /> _ and proper equipment, except as noted, to remove existing tanks end lines per the following Caution - Ballast level roust never exceed water or backfill level in the hole during installation. Inspect all fittings for proper alignment and possible "back-out" at the joints. M.AFHlc pgTg REVIgKjryg iz4F17AL
<br /> . Do not remove ballast until lank slab has been poured. Do not set remote pump motor until
<br /> procedure
<br /> iu ballosd water has been removed from .lank, Follow pipe manufacturer's recommendations on cure time before disturbing joints or testing. TANK + PIPING INSTALATION
<br /> Contractor, os part of the comb act will execute and comply with lha Company's °Addendum If It is anticipated that the temperature will drop below 70' F (21' C) of any brae during the
<br /> caring process, apply heat the joints. Only chemical or electrical devices recommended by
<br /> tank Disposal Certification Agreement" GENERAL REQUIREMENTS
<br /> TANK HOLD-DOWNS (Tie-Downs)', install hold down "logs" acceptableat all locations with known water pipe manufacturer are acceptable for this purpose. Do not use open flame or sparking devices,
<br /> 0 All tanks and piping shall be removed and disposed of in accordance with the Addendum Tank Gond)tions and at those locations where water is found during tank installations, Refer to "Tank such as propane torches, to cure resin.
<br /> oC Disposal Certification Agreement and applicable stale and local regulations. flold- Ouwn' drawing for design, lubrication and installation requirements, and to Section 05 of
<br /> these specifications and drawing F- 10 (N-PET -1`10-5.Ori THREADED JOINTS: Threaded steel pipe joints must be reamed and have clean cut, perfect 7-��'V� C
<br /> Removal of tanks and lines shell comply with API Recommended Practice 1604, Repnoval and threads and be made up with non-hardening joint compound insoluble in petroleum products r
<br /> Disposal of Used Underground Storage Tanks - December 1987 and March 1989 supplement. approved by Company Representative. DO NOT USE ADHESIVE FOR THREADED CONNECTIONS //- j 11Acv -,LVD.
<br /> a' REMOTE TURBINE: Contractor to verify turbine head will be 4-8" above lank bottom. Do not
<br /> a, -rr�nc�r, CA.
<br /> Contractor shall also comply with current NFPA and loccl regulations. instole lurlfine d turbine shaft length exceeds tank diameter plus burial depthl Typical joint compound,
<br /> o Company Representative is responsible for removal of oil reusable product from the tanks. Notify Company Representative. who will determine the course of action, If shaft exceeds tank HI-PRO THREAD SEALANT: REFER TO A. 0. SMITH BULLETIN No. 04510.
<br /> Product will be returned to terminal or other company facility, diameter plus burial depth. Rectorseal
<br /> Ilrx 51-
<br /> a Chevron
<br /> Excavate to the top of each tank. Core must be token to prevent breaking any piping and
<br /> or app
<br /> w approved equal
<br /> releasing product in the environment. Prior to starting excavation, the contractor shall ensure
<br /> power is shut off to any circuit, whose conduit may cross the excavation FIBERGLASS TO STEEL PIPE OR FLEXIBLE CONNECTORS: Thread fiberglass threaded-end
<br /> adopters into the steel pipe or fitting before bonding onto the fiberglass pipe. Use male end Northwest Rion
<br /> B fiberglass filling when connecting to flexible connectors. All flexible connectors ore male-swivel by B
<br /> female. The female and connects to the fiberglass piping.
<br /> DO NOT USE ADHESIVE FOR THREADED CONN .TION .
<br /> ROBERT H. LEE do ASSOCIATES. INC.
<br /> ARCFi7EC17/R@ ENOWEEFlNO ENNPgNAENfAL BBiNICEB
<br /> 1137 NORM McDOWELL BOULEVARD PETALUMA CA 94954 (707) 765-1660
<br /> JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER
<br /> Fill REVIEW INITIAL DATE DATE:
<br /> PRELIMINARY
<br /> PLANNING DR. BY.4te1<
<br /> O
<br /> ' STEEL BID
<br /> BLDG PERMIT APPR.: ' ;t/j�./M
<br /> d A GENERAL BID
<br /> PERMIT REDS RHL /#8740.10A
<br /> Z
<br /> CD CONSTRUCTICN SHEET
<br /> Z - Donot use dwing
<br /> a for ra
<br /> construction F-6
<br /> unless Intl oled
<br /> 0 1 2 0 4 6 45 7 8 9 10 it 12 13 14 15 16- 17 ° is
<br />
|