Laserfiche WebLink
TANKNOLOGY — UNDERGROUND %�aK DETECTION SYSTEM — (V6. ) <br />CHEVRON USA Page 10 <br />H000396-18-164946-01 - Mar 25, 1996, 12:34 <br />'+d+' X14::::: 9._.A _._....�._. pl_' C.:::.,'F" ...I.. W:" T' 0.....N R,.'� N,...B r'•"•`u F-tir *yr <br />TEST DATE May 25, 1996 <br />ST442T TIME 10:42:47 <br />CUSTOMER CALIFORNIA PETROLEUM <br />LOCATION NAME CHEVRON USA <br />LOCATION CODE <br />TANK CONFIGURATION <br />TANK NUMBER <br />TANK CONTENTS/SIZE <br />TANK DIAMETER <br />TANK MATERIAL <br />TANK INCLINATION <br />SURFACE TO GROUND WATER <br />SURFACE TO TANK TOP <br />PRE -PUMPING WATER LEVEL <br />DIPPED FUEL LEVEL <br />DIPPED WATER LEVEL <br />PRESSURE SETPOINT <br />TEST INITIAL WATER LEVEL <br />TEST FINAL WATER LEVEL <br />WATER INGRESS DETECTED <br />BUBBLE SIGNATURES <br />ULLAGE INGRESS <br />TEST RESULT <br />COMMENTS: <br />: Multiple <br />: 01 <br />: NLP12000 <br />124 <br />Fibreglass <br />-1.00 <br />900.00 <br />58.00 <br />0.00 <br />.,.,...,EXISTING, ... ... ... . NEW. <br />initial__ . ..final_ <br />TEST RESULTS <br />73.00 <br />73„00 <br />0.00 <br />0.00 <br />ELECTRONIC <br />DISPENSER <br />—0.50 <br />CONCLUSIONS: LINE 1A TESTED TIGHT. <br />0.006 <br />0.003 <br />11:40 12:10 0.000 GPH <br />No <br />No <br />No <br />Passed <br />02 <br />SUN12000 <br />124 in <br />Fibreglass <br />-1.00 .x <br />900.00 in <br />57.00 in <br />0.00 in <br />initial. final <br />73.00 73.06 in <br />0.00 0.00 in <br />FR EE: a t.J t_.... 'I' <br />--0.50 PSI <br />0.003 .in <br />0.006 in <br />No <br />No <br />No <br />Passed <br />CONCLUSION: TANKS #1 AND #2 TESTED TIGHT, <br />L......:a' N L_” ..'1'" Fi: <:....p... Fct EE.. '.ii> 0....J N_..... _N.. <br />DEL LINE START END RATE <br />LINE SYS MTRL T.IME._._ TIME.._ OF LOSS.,, RESULTS. COMMENTS .._._..__,.,, <br />01A PS FRP 11:00 11:30 0.000 GPH Passed <br />#1B <br />#1C <br />#1D <br />LEAK DETECTOR <br />.,.,...,EXISTING, ... ... ... . NEW. <br />PUMP MANF. FE PETRO <br />TEST RESULTS <br />LINE TEST <br />PRESSURE 50.00 PSI <br />SERIAL NUMBER <br />ELECTRONIC <br />DISPENSER <br />SHEAR VALVES OPERATE Yes <br />CONCLUSIONS: LINE 1A TESTED TIGHT. <br />#2A PS FRP <br />11:40 12:10 0.000 GPH <br />Passed <br />#2B <br />#2C <br />#2D <br />LEAK DETECTOR : <br />EXISTING NEWPUMP <br />........... MANF. FE PETRO <br />TEST RESULTS <br />LINE TEST <br />PRESSURE 50.00 PSI <br />SERIAL NUMBER <br />ELECTRONIC <br />DISPENSER <br />SHEAR VALVES OPERATE Yes <br />CONCLUSIONS: LINE 2A TESTED TIGHT. <br />This test was conducted in accordance with U.5. EPA Rule 40 CFR Parts 280 and 2811. <br />V.. __... H000396-1.8.-164946.._01. <br />VALDEN 80D 101 �VAC'J—TECT(tm ) Test Number <br />