Laserfiche WebLink
AN ESOP COMPANY -� <br />ROBERT H. LEE & ASSOCIATES, INC. <br />ARCHITECTURE • ENGINEERING ENVIRONMENTAL SERVICES <br />1137 NORTH McOOWELL BOULEVARD • PETALUMA. CALIFORNIA 94954-11'10 (707) 765-1660 <br />Meiling Address: P.O. Box 750906. Petaluma, CA 94975-0908 Fax (707) 765-9908 <br />May 4, 1995 <br />BRIAN F. ZITA <br />Attachments <br />Architect <br />JOHN W. JOHNSON <br />Architect <br />Mr. Doug Wilson <br />San Joaquin County Environmental Health <br />r' <br />JOHN B. HICKS <br />P.O. Box 388 <br />CA <br />Architect <br />Stockton, CA 95201 <br />I..._ <br />CECIL R. SPENCER <br />(209) 468-3420 <br />qq <br />Ilii/1 ( U Li O� <br />Architect <br />JAMES H. RAY <br />RE: CHEVRON USA PRODUCTS COMPANY <br />Civil Engineer <br />3775 TRACY BLVD. <br />ENVIRONMENTAL kEF,i.ihl <br />TRACY, CA <br />PERMIT/SERVICES <br />PHIL JOB #8740.10 <br />Dear Mr. Wilson: <br />We are proceeding with plans for the remodel of a petroleum facility at the above location. <br />Attached are two prints showing the proposed site layout which includes the removal and <br />installation of new underground tanks & piping. <br />These plans are scheduled to be finalized by June 15, 1995. We would appreciate receiving a <br />written response to the following items for developing our Construction Documents on or before <br />this date. <br />1. Are Phase I (fill) and/or Phase II (dispensers) vapor recovery systems required? <br />2. Is any secondary containment required for vent or vapor recovery piping at this time? <br />3. Are sample wells required in the immediate vicinity of the underground tanks? <br />4. Do you anticipate any change in regulations in the near future which could affect our projects? <br />5. Please send us your current regulationsiguidelines and forms for underground tank permits <br />(removal and installation). <br />6. Please also advise if any other agency should be contacted for their involvement in the permit <br />process. <br />7. We will also be removing an existing underground septic tank and sump. Please advise me of <br />any requirements to accomplish this. <br />8. Please include air quality permit information forms if possible. <br />We anticipate construction to begin in St�ptemher 1995. Thank you for your time and attention to <br />this project. <br />Very truly yours, <br />ROBERT H. /LEE & ASSOCIATES, INC. <br />Aklf / W—_ - <br />Maggie McLaughlin <br />Job Captain <br />Attachments <br />F:\V V V41). MSECDRY.CON <br />r' <br />MARIETTA. OA <br />SACRAMENTO, <br />CA <br />BELLEVUE. <br />WA <br />LA HABRA, <br />CA <br />