My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:22:07 PM
Creation date
11/6/2018 10:41:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3775\PR0231418\INSTALL\1995 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM PRINTSET INFORMATION <br />..i <br />1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />2. Plans drawn to scale in non -erasable Drint_ <br />3. _,G Plot plan to show location and number of tanks. <br />4. _XZ Tank cross-sectional diagram included on prints submitted. <br />5. _V_1' Detail of tank, piping system, excavation and cover. <br />6. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 1 1b ' i i D ).. L ., <br />7. Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. (Section 2635 (b) (2)) <br />8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)) <br />C19. \ Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />_:�•r�_—:J [Section 2635 (b) (6) & (7)) <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)) <br />11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)) <br />12. TANK COMPOSITION <br />TANK # <br /># ' # Z # 3 <br /># <br /># <br />CAPACITY/2r— <br />/2K /2K <br />MANUFACTURER <br />XERxes lrr44ES A'E✓LXES <br />COMPOSITION <br />Fb/ elz&t_ 11155 <br />MODEL <br />/0 v p/h <br />PRODUCT <br />FE&-UNL• rLU3VA1L. 66110 UA/L- <br />CORROSION PROTECTION <br />U.L. LISTED <br />Cg <br />COMPATIBILITY WITH 100% <br />METHANOL <br />eS' <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting-, tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)) <br />K C. Fiberglass [Sections 2635 (3) and 2631 (p)) <br />(1) Striker plate dimensions and materials. <br />Z (2) Striker plate under all accessible openings. <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi -annual inspection requirement). <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.