MATERIAL AND WORKMANSHIP I6. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED E: ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20
<br /> TO, THE STANDARDS OF THE FOLLOWING: MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP.
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK UNIFORM FIRE CODE (UFC)
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT
<br /> GRADE FOR THE PROCESS INTENDED. AMERICAN PETROLEUM INSTITUTE (API) WHICH 514ALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL
<br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS UNIFORM BUILDING CODE (UBC) PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER AND NATIONAL ELECTRIC CODE (NEC) SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. f4l
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE NATIONAL FIRE PROTECTION AGENCY (NFPA)
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND UNDERWRITER'S LABORATORIES, INC. (UL) G: G.C. SHALL DEMON57RATE TO OWNER'5 REPRESENTATIVE THAT ALL
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES CALIFORNIA REGULATIONS MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS.
<br /> INCORPORATING IN THE WOFZK WHEN REQUIRED BY THE OWNER'S AGENT, LOCAL ORDINANCES P OOMICT FOR
<br /> 12. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER
<br /> 3. WHEN REQUIRED BY THESE DOCUi ENT5 OR WHEN CALLED FOR BY THE Il. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY
<br /> OWNERS AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR DURATION OF THE CONTRACT A SITE HEALTH t SAFETY PLAN THAT WILL MNFR MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING �M /� fob /� fUl 11�5r Ofl p�'tl /.�
<br /> WAPPROVAL FULL HICH HE CONTEMPLATESTINOCORPORA7NIG IN THE WORK. WHEN 60 AND:
<br /> ANDEGTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, 15 NOT SHOWN ROUTE SUBJECT ON 51TE
<br /> APPROVAL BY OWNER'S REPRESENTATIVE.05DIRECT a WL=,1 WeG;111V4NJ° Ue NJV aU IS/:,1°
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE 400 dQC�/�QG3Q5�aDQ D.G3
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED 13. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S FI° E NOH IJ p Oaa,
<br /> AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE �J4���ry�7na
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF PRECEDENCE OVER OTHER INSTRUCTIONS.
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RI5K OF SUBSEQUENT THE SAFETY OFFICER TO THE OWNER'8 AGENT PRIOR TO COMMENCING WORK
<br /> REJECTION. ON THE SITE. A: G.C. TO NOTIFY OWNER'S REPRESENTATIVE TWO WORKING DAYS PRIOR
<br /> TO LINE TESTING. OWNER'S REPRESENTATIVE SHALL WITNESS ALL LINE
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE TESTING. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT
<br /> REGULATIONS. NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (1)
<br /> NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL
<br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS TRENCHES UNTIL AUTHORIZED BY OWNER'S RPRE$ENTATIVE.
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OR HAZARDOUS 51,55TANCE5 BE UNCOVERED.
<br /> OF THE OWNER'S AGENT/ENGINEER B: TEST PRESSURES SHALL BE: n
<br /> C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP 2" - 50 PSI AND APPLY SOAP SOLUTION. Llr4 V
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE 3" - 40 PSI AND APPLY SOAP SOLUTION,
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS CONDITION. jr THE CORRECTIVE ACTION IS INSUFFICIENT IN THE 3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. 4�1n1 � �O
<br /> PROJECT, IT 15 EXPECTED THAT THE MOST RESTRICTIVE CONDITIONS) OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL (�(a=��
<br /> WOULD APPLY. CORRECTIVE ACTION CAN BE IMPLEMENTED. C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND GAP PRIOR
<br /> APPLYTO TESTING. RELEASE
<br /> D: FROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM SHHALL BE TES EDFROM TOPOF VENT, T ROUGH MAN FOILD>(6)EXTTRACTOR 681 ��I�"/�URCH RD.
<br /> G 5
<br /> GENERAL CONDITIONS CLASS RATING OF 2-A,20-5:C WITHIN 50 FEET OF THE OPERATION. B45E AND RISER, STAE I CONTAINMENT MANHOLES, STAGE II VAPOR U R6%cvp baa
<br /> LINES TO ISLANDS AND STAGE II FLEX CONNECTORS AT D15PENSER(S). 951978-18071. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING 18. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY
<br /> COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE MEMBERS OF U.5A. 2 FULL WCRKING DAYS IN ADVANCE OF PERFORMING D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 �GeaG�l ��QQ�pa COMM`U'S'(
<br /> PROVIDED TO THE OWNER'S ENGINEER PRIOR TO THE START OF WORK. ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS.
<br /> NUMBER (800) 221-2600. CORRECT ANY LEAK5 AND RETEST.
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFAGTURER5
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA U5T E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER PETROLEUM WORK SCOPE PLUG FROM EACH EXTRACTOR AFTER TEST, REDUCE PRODUCT LINE -
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 15
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO 1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WOW PLAN AND COMPLETE.
<br /> OWNER SCHEDULE THAT COORDINATES SCHEDULING WITH OTHER PORTION$ OF ALTON
<br /> THE PROJECT TO THE FULLEST EXTENT POSSIBLE. F. SECONDARY PIPE MUST BE PROPERLY OUT INSPECT ALL PRIMARY A
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK PIPE SURFACES. PRESSURIZE SECONDARY PIPE t0 5 P51 AND SOAP ALL + NGINEERING, INC.
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 2. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING 15 IN PLACE OVER
<br /> OWNER GONTRACTCR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST SECURE FENCING PANELS TOGETHER TANK FIELD AND PIPING RUNS, AND SHALL BE UITNE55ED BY THE OWNER'S
<br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO REPRESENTATIVE. P.O. BOX 1025-
<br /> OWNER 3. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 G AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE 843 RISKE LANE
<br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC ON SITE FOR SAMPLING PRIOR TO OFF-HAUL BY CONTRACTOR,51TE SAFETY PLAN FOR TANK MIL. PLASTIC UNTIL 501E Ib REMOVED, ONLY WHEN SOIL IS TO , IN AREA STOCKPILED PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER WEST SACRAMENTO, CA 95691
<br /> INSTALLATION PRIOR TO THE START OF WORK. PAVING IS IN PLACE
<br /> APPROVED BY OWNER !9167 312-1888
<br /> CONTRACTOR WILL CONDUCT WEEKLY JOB 51TE SAFETY MEETINGS WITH IT'S FAX 313-1112
<br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER 4. G.C. SHALL PROVIDE FOR DISTRIBUTION OF ALL 14. G.C. SHALL PERFORM PREC161014 TEST ON PRODUCT LINES AFTER PAVING
<br /> EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS. 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION
<br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL THESE DRAJNaS AND SPECIFICATIONS,AS
<br /> 5. NOT USED. REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A IN5TRLWIENT5 OF SERVICE,REMAIN THE
<br /> A. GENERAL ENGINEERING CERTIFIED TESTER G.G. SHALL PROVIDE WRITTEN REPORT OF PRECISION PROPERTY OF WALTON EUDINEERIN,, INC.
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING TEST TO OWNER'S REPRESENTATIVE PRIOR TO OU.NER'5 ACCEPTANCE OF AND SHALL NOT 0 :sO FCR AVTEY HA IE
<br /> OTHER THAN THOSE FOR ED, H THEY HAVE
<br /> PROJECT. BEEN SUPPLIED OR PREPARED.THESE ORAUINaS
<br /> 6. CONTRACTOR SHALL HAVE THE FOLLOWING iN5URANCE. CONTRACTOR 5HALL SHALL NOT BE REPRODUCED,COPIED OR TRACED
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER15. GONTRACTCR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC 5AC<PRE5SURE WITHCUT THE EXPRESS MTTEN C045ENT OF
<br /> AS "ADDITIONAL INSURED". 6. NOT U5ED. TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. WALTON EGNEERM3, INC.
<br /> 1. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKS. COPYRIGHT © 1997 -
<br /> A. STATUTORY WORKMAN'S COMPREIHENSIVE LIABILITY 16. CONTRACTOR SHALL PO ANY OTHER TESTING AS REQUIRED BY LOCAL
<br /> e. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PER REGULATIONS.
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE DRAWINGS, WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE TANK
<br /> LIMIT OF NOT LE55 THAN $1,000,000 PER OCCURRENCE FOR BODILY HOLD-DOUJNS AS REQUIRED BY MANUFACTURER IN UIET-HOLE CONDITION$. 11. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. DRAWN BY MEL / TG
<br /> INJURY AND PROPERTY DAMAGE.
<br /> 18. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE :
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED 9. INSTALL UNDERGROUNDINSTRUCTIONS,
<br /> STORAGE TANKS PER DRAWINGS AND CURRENT COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY O'WNER'S GHKD BY MEL
<br /> MANUFACTURER'S I HAVE REC WHICH 5HALL BE FOLLOWED TI ALL -
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. REPRESENTATIVE AS FOLLOWS: -OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND MANUFACTURER'S GNEGKLI578 SHALL BE COMPLETED BY THE CONTRACTOR DATE 12 DEC 91
<br /> PROPERTY DAMAGE. AS EACH STEP IS COMPLETED. TANK BEDDING AND BACKFILL TO BE PEA I.2 FILL WITH WATER 70 HIGHEST PENETRATION.
<br /> GRAVEL. TANK BURY 18 TO BE MINIMUM 5 FEET, TANK BEDDING I5 TO BE 2. SPRAY PAINT TOP OF WATER SCALE PLOT FULL
<br /> 1. GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND A MINIMUM 12". TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'5, REQS.
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE 19. PROVIDE AND INSTALL CONDUIT t WIRING FOR PETROLEUM 8Y87EM(5) ,J05 NO. 43610
<br /> 5AT15FACTORY COMPLETION OF ALL U10,RK SHOWN ON, CALLED FOR, OR i0INSTALL EQUIPMENT A5 LISTED IN EQUIPMENT LIST AND PROVIDE AND PROVIDE CONDUIT FOR CARDREADERS AND OTHER PETROLEUM
<br /> .
<br /> REQUIRED BY THE DRAWINGS, EXCEPT 45 NOTED BY OTHERS. INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE ELECTRICAL AS INDICATED ON THE DRAWINGS,
<br /> 6. ALL WCRK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM PETROLEUM SYSTEM. 20. NOT USED. REVISIONS
<br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, II. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA 21. INSTALL MONITORING SYSTEM WITH ANNULAR SPACE PROBE, TURBINE SUMP
<br /> CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S DATE REV DESCRIPTION B
<br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, IN5TRUGTION5 SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE PROBES, AND TANK GAUGES, AND MONITOR CONTROL PANEL IN BUILDING PER
<br /> OR COUNTY ORDINANCES. DRAWINGS.
<br /> PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS
<br /> 9. ALL PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED. 22. INSTALL NEW DISPENSERS AS fNr)ICATED ON 517E PLAN$ AND DESCRIBED -- - -
<br /> CONTRACTOR, WHO 15 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT IN THE EQUIPMENT LIST.
<br /> CONDITIONS. A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM
<br /> RED THREAD IIA AND RED THREAD II WITH FITTINGS AND 23. INSTALL OTHER ITEMS PER EQUIPMENT LIST AND CONTRACT.
<br /> 10, GENERAL CONTRACTOR SHALL VISIT 51TE AND FAMILIARIZE HIMSELF OF 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY _
<br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING H15 BID. 3000L WITH ALCOHOL FITTINGS AND RP4S ADHESIVE, DO NOT MIX 24, NEW CONCRETE TAN< AND DRIVE SLABS AND OTHER CONCRETE AS
<br /> MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT SYSTEMS INDICATED ON SITE PLAN CONCRETE SHALL HAVE A MINIMUM -
<br /> 11. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIE5 TO SHALL BE UL APPROVED FOR !00% METHANOL. CONTAINMENT SYSTEM SHALL COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI. CONCRETE SHALL _ - -- -
<br /> REMAIN UNLESS NOTED OTHERWI5E. CONTRACTOR SHALL REPAIR OR BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES CONTAIN 8 POUNDS OF LAMPBLACK PER CUBIC YARD - USE DAVIS 8084.
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY AND/OR FITTINGS. (CONFIRM LAMPBLACK REQUIREMENT W/ OUANER/CONTRACT.) --- - - -
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S B, VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD 11 WITH 25. FULLY TEST ALL SYSTEMS, AND REPAIR A5 NECESSARY.
<br /> OPERATIONS. FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY
<br /> 12. ALL EXCAVATIONS SHALL BE PERFOFZ"IED IN COMPLIANCE WITH OSHA AND 3000L WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX 26. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK
<br /> STATE REGULATIONS. THE CONTRACTOR 15 REFERRED TO THE OSHA MANUFACTURER'5 MATERIALS. SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS,
<br /> BOOKLET, "EXCAVATING AND TRENCHING CPERATI01,15", FOR A SAFE 1LCRK. SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME I
<br /> FRAGTIGES GUIDE FOR PERFORMING EXCAVATION WORK C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND SHEET
<br /> TRAINED BY MANUFACTURER MATERIAL INVOICES. SUCH WCRK SHALL BE BILLED SEPARATELY,
<br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROvIDE OWNER WITH D; STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON .SCHEDULE_
<br /> "A5 BUILT" DRAWINGS CF ALL ITEMS INSTALLED BY SAME. "AS 5UILT5" 40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS OWNER SUPPLIED EQUIPMENT - GEN . ■(1�!
<br /> '� ® TES '
<br /> SHALL BE COMPLETED ON-51TE WITH INFORMATION NOTED DIRECTLY ON SHALL BE 300 P51 MALLEABLE IRON. - SCOPE ,
<br /> APPROVED JOB COPY.
<br /> CONTRACTGR 15 ADVISED TO CONFIRM OWNER SUPPLIED
<br /> 14. CONTRACTOR SHALL PROVIDE A L15T OF 51.5-CONTRACTOR8, IF ANY, WHO EQUIPMENT WITH OWNER. � '
<br /> WILL BE USED ON THE PROJECT,
<br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES
<br /> REQUIRED TO RUN THE FACILITY. '
<br /> PEN "Ito
<br /> Or- J 5NEE 15
<br />
|