Laserfiche WebLink
• <br /> STATE OF CALIFORNIA <br /> n STATE WATER RESOURCES CONTROL BOARD <br /> IJYkI UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B W K; <br /> COMPLETE A SEPARATE FORM FOR H TANK SYSTEM. °' •a�' o <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION <br /> ONE ITEM ❑ 2 INTERIM PERMIT 4 AMENDED PERMIT ❑ T PERMAN SED ONSITE <br /> ❑ ❑ 8 TEMPORARY TANK CLOSURE B TANK O <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN V <br /> A. OWNER'S TANK I.D.# O <br /> B. MANUFACTURED BY: <br /> G DATE INSTALLED(MO/DAVA'EAR) <br /> 0. TANK CAPACITY IN GALLONS: <br /> II.TANK NTENTS IFAIISMARKED.COMPLETEITEMC. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUNLEADEO 3 DIESEL ❑ g AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ BO EMPTY 1 PRODUCT ❑ 1EPREMIUM 4 GASAHOL 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 UNLEADED <br /> LEAD D ❑ 5 JET FUEL ❑ <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> III. TANK CONSTRUCTION MARKONEITEMONLYINBOXESA,B,ANDC,ANDALLTHATAPPLIESINBOXDANDE <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 95 UNKNOWN <br /> ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ I BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS <br /> ❑ d STEEL CLAD W7 FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATIBLE W/FRP <br /> (Primwy T&nk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL 7 YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP <br /> ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE �95 UNKNOWN <br /> ❑ 99 OTHER <br /> E.SPILLAND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) <br /> OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> =DETECTION [�] <br /> PE A U 1 SUCTION p U 2 PRESSURE A U 3 GRAVITY <br /> A U 99 OTHER <br /> TION A U 7 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH <br /> A U 95 UNKNOWN p U 99 OTHER <br /> AND A U / BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> N A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING <br /> N A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 6 100% METHANOL COMPATIBLE W/FRP <br /> A U 95 UNKNOWN p U 99 OTHER <br /> CTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 31,IONRORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING D 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> FL <br /> 6 TANK TESTING ❑ 7 IN TERSTITIAL MONITORING ❑ 97 NONE <br /> ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF <br /> SUBSTANCE REMAININGNO <br /> 3.WAS TANK FILLED WITH <br /> GALYES ❑ ❑ <br /> GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPBINTEO A SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COJUNjTTY�# JURISDICTION FACILITY# TANK# <br /> FPERMITNU—MBER <br /> ATE LD.# �ZIU�I Q� 2 <br /> •`-�PERMIT APPROVED BY/DATE <br /> P RMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORM B (12-91) FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATI S <br /> I�ORORN <br />