Laserfiche WebLink
i <br /> REVISIONS BY <br /> i <br /> a <br /> cc, O <br /> -u D� <br /> a0 wo <br /> a w co00 <br /> f.0 r M <br /> Q j O <br /> ^O <br /> C1u) 00G <br /> O [_ t0 <br /> w 4I <br /> Z w 3 Z Q O1 <br /> Ec� r V <br /> W L Q <br /> S u m <br /> 0 Q Y <br /> O cn <br /> 0 cc <br /> 3 0 TURNER RD. <br /> J <br /> Z <br /> TURNER RD. EXISTING SIGN <br /> SIDEWALK <br /> CURBED PLANTER AREA CURBED PLANTER AREA T <br /> O 0 > rLn <br /> I z w a — <br /> f 2420 TURNER RD. on EXISTING DISPENSERS <br /> LODI, CA w „J, rn <br /> u F g o I EXISTING UG TANKS — W0iol <br /> vai c� z 3 _ ] APPA <br /> r C, _ <br /> EXISTING CANOPY <br /> 0 <br /> J <br /> Z <br /> ELECTRICAL GUTTER BOX <br /> PLANTER <br /> Lu <br /> ko <br /> T z Z a <br /> a in <br /> = <br /> m EXISTING TANK MONITOR <br /> z w n > 00 <br /> a 00 <br /> NTS I n w v g Q U <br /> VICINITY �l 0 <br /> MAP �a = w w h-1 w Z < O7 TF <br /> I Q <br /> Y E"' (� � 2 � ro � <br /> a u inj < � ow <br /> 00 U <br /> w PLAZA LIQUOR #2 0 .� w U ' <br /> z <br /> •,- rn Lo <br /> < '-i J <br /> => rq <Q u <br /> SCOPE OF WORK LAUNDROMAT <br /> O Q <br /> PER CALIFORNIA AIR QUALITY BOARD REQUIREMENTS I I O <br /> U <br /> INSTALLATION OF HEALY, CLEAN AIR SYSTEM (CAS) AND <br /> PLANTER w SIDEWALK WITH OVERHANG PLANTER <br /> VEEDER-ROOT, IN STATION DIAGNOSTICS (ISD) ARE REQUIRED z fD <br /> THIS WILL ENTAIL THE FOLLOWING WORK AT THIS EXISTING <br /> w J <br /> LOCATION. SEE ATTACHED LEVEL IN SUBMITTAL PACKAGE J <br /> u <br /> A. REMOVE CONCRETE- PLANTS IN PLANTER AREA AND INSTALL <br /> A NEW (CAS) TANK, POUR A NEW PLANTER CURB AND PLANT NEW <br /> RHAPHIOLESPIS TO REPLACE THOSE LOST TO THE (CAS) TANK PAID. <br /> SEE PAGE 2 <br /> B. IN THE TANK AREA OF THE TANKS-EXISTING TURBINE SUMP SENSORS SANWZ'As LfHll µ <br /> AND TANK LEVEL PROBES WILL BE REPLACED WITH NEW. ALL WORK BE RONMENT ONCt' �Y <br /> UNDERGROUND. SEE PAGE 3 EMA IINPO �i 6527 I/I <br /> C. IN THE DISPENSER AREA EXISTING DISPENSOR PAN SENSORS WILL BE C��sO�ECTTO' > <br /> REPLACED WITH NEW, ALL WORK IS UNDERGROUND. SEE PAGE 3' PaOp09A'� To <br /> P/L 179' Q owptA Mppooff -4 t� <br /> D. IN THE STORE AREA THE EXISTING TANK MONITOR WILL BE WE1sto y O N <br /> REPLACED IN THE SAME LOCATION WITH A NEW STYLE THAT IS AIR �� CONDI1I�s���''� � ui � Q � <br /> QUALITY BOARD APPROVED. SEE PAGE 1 RE o 0 w 0) r <br /> Z � <br /> shovms <br /> E. THERE WILL BE NO LOAD CHANGE IN THE ELECTRICAL LOAD ko <br /> slte s� `um/�^ se°0 Q Q <br /> TO THE NEW WALL MOUNTED TANK MONITOR AND ALL EXISTING EY'S pate ^dsond otaPp Q r <br /> WILL BE BROKEN AND NEW WIRE RUN TO PROBE AND SENSOR nPPPlgO"a^ddoesd°1a°tp°szof stateiawsotl°°elotd+^a^Bas qN O ` Z Ot Z <br /> LOCATIONS THROUGH EXISITING CONDUITS. NO NEW EXCAVATION IS at1Op ° a. <br /> '0 1tert J N O O oN Q <br /> EXPECTED. WIRING FROM TANK MONITOR TO SENSORS AND PROBES a r� J U .� <br /> ARE LOW VOLTAGE. <br /> W <br /> Z <br /> O <br /> )ATE: 9-5-07 <br /> SCALE: 1"=20' <br /> DRAWN BY: WSG <br /> JOB: PLAZA LIQUOR <br /> SHEET 1 OF 3 <br /> SITE PLAN <br />