Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Page2of2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54. <br /> 49a54b <br /> ❑ L CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS ❑99.OTHER(Specify):_ <br /> PANEL MANUFACTURER: _490-55 MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57 i MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 49659 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49061 <br /> UDC MONITORING STOPS THE FLAW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 49"2 <br /> 2.UDC CONSTRUCTION IS Eli.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 49044. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ I.LIQUID ❑2.PRESSURE ❑3.VA_C_U_UM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS—ff a.YES ❑b.NO 49x646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED_ PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644_11 <br /> 02.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 0-90-67 <br /> VIII.RECORDKEEPING <br /> The following mooitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490.68. ❑Visual Inspection Records 490.686 ®Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 49668d ❑ Tank gauging results(and supporting documentation records). 49Mk <br /> ®ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-688 <br /> ®Equipment maintenance and calibration records. 49a68h <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49"9a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69e <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-691 <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49M9f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69¢ <br /> ❑ OTHER(Specify):w9b,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment m specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact personas)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that 1)the dailyiroutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following personas)are responsible for perforating the monitoring and equipment maintenance: <br /> NAME EPIC Compliance 490-72 TITLE Technician <br /> 490-73 <br /> NAME 490.74 TITLE 49x75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: 1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE - T T 490-76 DATE: 49a77 <br /> REPRJESEN G. 1.Trak Owns cram,02.Facilir ow'vrr cram, 0 3 AuthorizN R reunmmive ofOwner <br /> APPLICANT NAME(print): 490-78 APPLICANT TIRE: 0-90-79 <br /> Todd Harris Regional Env.Manager <br />