My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
BILLING 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:23:14 PM
Creation date
11/6/2018 11:33:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\2500\PR0232507\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
9/8/2016 6:06:18 PM
QuestysRecordID
3186027
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> 'RESPONSE PLAN-PAGE I <br /> (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION am. <br /> 2 d s Y 3 xw r w4"r W3 .( - a` f yL 5 1 Yl`Yv 3u F <br /> 6RNIATI�N - � Fisk�y eFt�y�•af�t��'�'"�r.3`,�R'0'.���. <br /> FACILITY B)# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> MCI, doing business as, Verizon Business <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY IN. <br /> 2500 W. Turner Road Lodi sa <br /> '3 <br /> It. SPILL CONTROL ANDCIs IEAI�UPn„?1yiS <br /> ,..,. IOb ' <br /> � <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shail be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to somm water systems. <br /> ➢ We will review,secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> �.,% IIT��PI_I?T.�•*G,,Ql�1' 0�� , � ( .���� ��'y” ' <br /> PERIODIC aTAI\-PENANCE: Spill control and clean-up equipment kept permanently ousite is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SrrF,BVI'AVAILABLE FOR USE IF NEEDED: Co late on a icable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RI0. R20. RIO. <br /> RIi. R21. mi. <br /> R12 R22. R32. <br /> Rll, AD. R33. <br /> Rn4. R2A. Ru. <br /> R13. R25. R35. <br /> THE FOLLOWING PERSON(S)IS/AAE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME RQ TITLE Rao. <br /> Gary Duvall UST Designated O eator <br /> NAME Mi. TITLE asl. <br /> Todd Harris Regional Environmental Manager <br /> NAME R42. TITLE Rsz <br /> NAME R43. TITLE Ata. <br /> WNW� "-,:va�j <br /> r. r t r � 1 ,,: � IlxC;1TURS 1� <br /> '" . .'"r'u�: <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ® L ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPEC71ON BY QUALMM PERSONS ®3. RECALIBRATION OF EQUIPMENT 860. <br /> ❑99. OTHER(Specify): ML <br /> UN-022B-1/3 www.unidMLorg Rev.04)02/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.