Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN - PAGE I (One form per facility) <br /> TYPE OF ACTION E3 1.NEW PLAN 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUS SS NAME(Same az FACILITY NAME) � Roz. <br /> 1_1n 5 Ces D = oN <br /> BUSINESS SITE ADDRESS rto3. CITY Roa <br /> aSo o W- �r`e✓ zo <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will he used to contain and clean up manageable spills of bazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-bazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick Boating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or von-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutmliu <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IF NEEDED: (Complete nly ifapplicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. R30. <br /> R11. R21. RI1. <br /> R12. M2. R33. <br /> R13. M3. R33. <br /> R14. R24. Ria. <br /> R15. a25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME <br /> TITLE <br /> Lj ri_,, lavee,-, uo. <br /> NAME RSL TITLE R51. <br /> 0. Cr <br /> NAME 10, <br /> jI Ree. TITLE R52. <br /> OAO <br /> NAME Rai. TITLE svic _ M3. <br /> V. MONITORING INDICATORS <br /> IF pf)NITORING INDICATES A POSSIBLE UN6 TTHORIZED RELEASE,STEPS Tsl VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> Additional system testing or data collection Inspection by qualified persons gMecalibmtion of equipment <br /> Other: <br /> RW. <br /> UST Response Plan(3/2008)-1/3 <br />