Laserfiche WebLink
r <br /> )f"`ECIf iCATIONS <br /> 1. DEADMAN TO BE LOWERED DOWN IN TANK <br /> !TOLE WITH THE CABLES ATTACHED. - Ei1VIf0}(9X ,„y ',3y9tO4i1 <br /> 2. BACKFILL THE TANK HOLE MT14 12” OF 1. Shall consist of tl.,4xible ,IT!mary pipe contained <br /> PEA GRAVEL AND THEN SET THE TANK IN within a flexible o0in ,..ne'r e. <br /> - 4" CONCRETE COLLAR - P'P <br /> PLACE IN ACCORDANCE WITH THE TANK <br /> A7 ACHMBUILDING MANUFACTURES SPECIFICATIONS. NATIVE SOIL 2 Shull be cotlr „ , heresy icer , shall be no fittings or <br /> ATTACHMENT. NQTESL piping co s %y'.S. for either the primary or secondary <br /> 1. <br /> LACE STRAPS <br /> ce <br /> 2. PAINT UP PE ABOVEBELOW DGRAD LOCATION 3 AND SECURE E (TYP ON TANK EWITHDCABLE CLAMPS MINN ATTACH CABLES OVER, OF TOR TANK TANK <br /> HOLD-DOWN 3. ShaTANK n tpu eider watertight costo not visible or accessible from <br /> POLYETHYLENE 15 ri pe which are <br /> 3 PER CABLE END PULL CABLE TIGHT WITH <br /> g containment of the tanks piping <br /> TO MATCH BLDG. } TERMINATION PLUG, SEE 29 - COME ALONG PRIOR TO ATTACHING CABLE CLAMPS. PEA GRAVEL and its associated fillings, and the shear valve assembly <br /> - --FILL GAP BE 7WEEN PIPE & WALL W17H BACKFILL located below each ground fuel dispenser unit. <br /> RESILIENT FILL MATERIAL AS REQUIRED. 4. REFER TO HOLD DOWN CALCULATIONS, <br /> 2' FIBERGLASS BELL & TERMINATION ASSEMBLY SHEET P-t FOR NUMBER OF HOLD DOWN DEADMAN 4, Shall be made of non--corrosive materials, d i/ metallic, <br /> FEMALE. OR MALE AS INCLUDES (1) SECONDARY COMPRESSION STRAPS REQUIRED such as the finings and couplings, isolated from <br /> PREFERRED 2"o % 24" LONG FLEX CONNECTOR SEAL �EF5036 h (RI 3' $ECP•Oi4 OF - L corrosion causing elements. <br /> �_ TITE FLEX WITH FLEXIBLE PPE, D" SYSTEM RIGID PIPE. 5. Outer secondary containment system Shall be of such a <br /> l'1 'SOILCONTAINMENTSAFE <br /> BOOT OR iELEFLEx ///---FILTER FABRIC IF REQUIRED. SEE design and made of materials to hove sufficient strength <br /> SOIL SAFE .0" NEW OR EXISTING WALL / NOTE g10 OF SPECIFICATIONS. to withstand the maximum underground burial loads end <br /> NEW PIPE PENETRATING WALL // tested in accordance with AASHTO M294. <br /> STAINLESS STEEL CABLE CLAMPS <br /> (TYP. OF 3 MINIMUM). 6. Flexible inner primary piping system shall be capable of <br /> withstanding liquid pressure five times greater than the <br /> designed operating pressures. <br /> STANCES$ STEEL ESCUTCHEON <br /> PLATES <br /> 7. Outer secondary containment system shalt undergo an air <br /> ADAPTOR p4 REB AT ® EA. CORN. pressure hold test (3 l0 5 psi) oiler Installation and <br /> W/ N3 TIES 16" 0 C. before the foal backfin. <br /> ' - JUMP 8. Flexible Inner rimer j <br /> ' <br /> ADAPTOR I primary P'P�ng system aholl be sub ect to <br /> 60 psi air pressure hold test prior to final backfin <br /> -OPEN VENT CAP FEMALE CUIJPLING ----- -------- DRILL PIPE ACCESS HOLE IN SAFE PLACE; �� 9. Design of secondaryycantonment system shall permit any <br /> FOR DIESEL CAULK AND SEAL AFTER INSTALLATION, 12'x12' PRECAST r'QNC DEADMAN EA. SIDE OF leak 'n the rimae n system to flow from Its source <br /> I ' •r� TANK (MINIMUM) SEE P-1, TANK HOLD DOWN to a surface access containment chamber which can be <br /> ZT/2" <br /> CALC. FOR SIZE REQUIRED fitted with on electronic leek detelion system10. Secondary conPainment pipe shall be sized to oltow removal <br /> m STAINLESS STEEL STRANDED CABLE <br /> FURNISHED BV THE GENERAL CONTRAC TOH, of primary pipe without need br excavahan. <br /> nUSE 3 CABLE CLAMPS PER END CABLE <br /> —EXISTING VENT RISER <br /> SPACED 2" APART AND ONE a"WITH LONG LOOSE <br /> N ENO. WRAP H CALPICO TAPE AND COVER <br /> r35 r_ --S'`- WITH ASPHALT EMULSION. <br /> 6 TERMINATION ASSEMBLY DETAIL (ENVIROFLEX PIPING) 4BLDG. PSGALE� ,-1/2"=,�-°" TANK HOLD DOWN DETAIL <br /> ENETRATION DETAIL SCALE: NONE <br /> 1 <br /> II i_c <br /> _1. EXTERIOR INTERIOR <br /> NPT CLOSE NIPPLES (TYP) - -- LOCKABLE BALL VALVES J7 IN51UE OF SUMP OUTSIDE OF SUMP <br /> �f GALVANIZED 3/16" STEEL — <br /> 2" a FIBERGLASS VENT LINE - CONCRETE OR ASPHALT ENCLOSURE BY GENERAL CONTRACTOR. <br /> SLOPE DOWN TO TANK 1/4" PER GRADE COVER PANT TO MATCH BUILDING AND <br /> FOOT (MINIMUM BURY L4 RISER ANCHOR 10 WALL. <br /> LOCATION IS 18 BELOW GRADE) -- 6" WIDE YELLOW MARKING <br /> TAPE ALONG TRENCH CONOUIL-- <br /> ALLEN MFG q AMT-1006-RE, WALL PENETRATION, SEE 4 <br /> BACKFILL MATERIAL, PEA NPT TEES & PLUGS — <br /> 0'_0' FG GRAVEL (TYP.) BELOW / BLACK IRON FUEL SUPPLY & RETURN <br /> w._...f CONCRETE OR ASPHALT /, FIELD GRILL SUMP FOR BULKHEAD <br /> `n r 19 GRADE COVER, LINES TO ENGINE ROOM CONNECTION AND PIPE INSERT, SEE 22 , SHEET <br /> ' -"- SEE NOTES 1 AND 2 P-3. <br /> 90' ELBOWS <br /> C Z <br /> UNIONS TANK VENT LINE <br /> ..G I —CONCRETE SLAB TANK VENT LINE -- <br /> II I I _ TOP OFy3" MIN - - <br /> PIPE - <br /> D 0 . a ° . a ° 0 , O - <br /> (E) BLDG. FOOTING l�.___ _J �f• °o •D 0 a °o• o ° D o 0 0 . ° ° <br /> 3" MIN—'..til �."- ( ° D D o • ° o <br /> FIELD DRILL SUMP FOR <br /> �T _ (.�IVst ANCHOR UNISTRUT TO CONCRETE BULKHEAD ND PIPE <br /> SHEET <br /> 1. BACK FILL AND COMPACTION FOR ALL CONDUIT & PIPING TRENCHES TO MEET FLOOR & CLAMP PIPING TO IlNI57RUi P-3 21 <br /> STATE, CITY, COUNTY, AND LOCAL REQUIREMENTS. NOTE: <br /> a"m SECONDARY PIPE. SEE 26 <br /> 2. BACKFILL AND COMPACTION FOR SERVICE LATERAL CONDUIT TRENCH TO O - REFER 70 HEFTEQUIP-3 LIST <br /> LOCAL ELECTRIC UTILITY COMPANY REQUIREMENTS. IF SOIL IS NOT PRIMARY RETURN PIPE, SEE 25 ITEM ON SHEET P-3 <br /> ROCK FREE. ADD 4" TO DEPTH OF SERVICE LATERAL CONDUIT TRENCH. <br /> PRIMARY SUPPLY PIPE, SEE 15 - <br /> NOTE; <br /> THIS DETAIL APPLIES TO ENVIROFLEX <br /> PIPING INSTALLATIONS ONLY. <br /> 9 VENT RISER AT BUILDING _ /2' 7 TRENCH DETAIL 5G"`E' "°NE 5 ABOVE GROUND PIPING TERMINATION 1USE ""'ERE ONLY)BUILDING 2 SUMP PENETRATION DTL (FIBERGLASS PIPING) <br /> SCALE r 1 ( EXISTING ONLY) <br /> NOTE <br /> 1 TEMPORARY TANK & PIPING <br /> ARRANGEMENT TO BE REVIEWED -....._...... _ <br /> I � & APPROVED BY GOVERNING FIRE <br /> NO IF DEPARTMENT PRIOR TO INSTALLATION. - SEAL BY LOCAL ENGINEER <br /> 1"-3" CONCRETE CROWN, -- CENTER WELL BOX DIRECTLY OVER - '-'— <br /> v CONFIRM W/ PACIFIC BELL TEST PIPE AS SHOWN, LIMITEDI ANTI-SIPHON VALVE Ro®QpT H. LON & A1330GIATH84 INC. <br /> .J ENGINEER, ACCESS MANHOLE FMCO WHEATON UNIVERSAL VALVE MCHIll PI AF➢•s4o ala <br /> #A722 -001, 12" A MANHOLE WITH #403 SERIES — <br /> LOCKING CAP AND COLLAR PIPE CLAMPS zar w.VaTrwi aw. ceucuvt co s.we Iwo ms wvro <br /> .xier w. „nrwov rw..cer .rocs,v Aar.env ere,sua <br /> w _ _ „, gex• d _..---;.ac. ' 2"o BLACKI (REOEVERY <br /> RON - 6' EMERGENCY VENT UNISTRUT PIPE70') <br /> S$UPPORT <br /> - <br /> • _ VENT w/ VENT CAW - <br /> GALV, SHEET METAL <br /> CHECK VALVE —\\ CONTAINMENT PAN -- <br /> SUMP 'WALL- - - <br /> �- • -CONCRETE SLAB - ENVIRCFLEX SECONDARY PIPING <br /> r ,u RETURN <br /> (SEE EQUIPMENT LIST FOR <br /> IT ( SIZE REQUIRED) <br /> 'a , SUCTION SUPPLY LINE ----� - PIPE SUPPORT PLAN <br /> V <br /> n .r J V i ENVIROFLEX PRIMARY PIPING - - <br /> NO?E. - K-RAIL (SEE SITE PLAN FOR ISSUED FOR BID/PERMIT 11/28/94 CTL <br /> r� TEST POINT PIPE & SATURATOR TESTING N0. REVISIONS / AUTHORIZATIONS DAIS BY <br /> SEE SITE. PLAN FOR 512E REWIRED} <br /> rn PIPE OBTAINED FROM AARDVARK CORP. REQUIRED LAYOUT II <br /> 4' SCH. 40 P,V,C. & THREADED --- 1415 MERIDIAN EAST. PUYALLUP, <br /> » COUPLING TO 2'-0" BELOW GRADE WASHINGTON 98371 PH (206)927 -4321 , <br /> (GSE OR EQUAL) II - _ STANDARD TANK AND <br /> 4" 0 SDH PVC FACTORY = PIPING DETAILS <br /> SLOTTED TEST WELL PPF SLOTS LENGTH OF TEST PIPE WILL VARY - <br /> L 020'. APPROX, 1/4' APART X 2- PER DEPTH OF EXCAVATION <br /> LONG APPRO% 48 SLOTS PER FT -...... <br /> CONTA-- - <br /> - - II GALV. SHEET METAL _ ° DRAWINGS PREPARED FOR <br /> PAN <br /> 4" m PVC. PIPE CAP--- I UNDER I FUELPIPINGPACIFIC A, BELL <br /> INSTALL IN DIAGONAL CORNERS OF <br /> OFCLQ�EDEXCAVATED <br /> END OF PIPE AT BOTTOM- _ TANK HOLE UNLESS SITE PLAN <br /> OF EXCA VA IED TANK HOLE SPECIFIES OTHERWISE <br /> PEA GRAVEL HACK FILL-- Y — r _ _ _ RE TI N FACILITY ADDRESS SACRAMENTO, CALIFORNIA <br /> "IFIr -7S PLY ENVIROFLE% FLAT BULKHEAD FITTING <br /> Q FIELD DRILL SUMP FOR 1® EAST 12TH STREET <br /> FOR WET 4Jf DRY HOLE INSTALLATIONS FOOT VALVE <br /> BULKHEAD <br /> FITTING TRACY CALIFORNIA <br /> CONVAULi OR ENVIROYAULT U L. 4 <br /> USTED ABOVEGROUND VAULTED <br /> 1� TANK. (TEMPORARY TANK FOR TEMP. PIPE SUPPORT - <br /> N� GENERATOR) -' <br /> DATE: 17NOV94 DRAWN BY. SEL <br /> r BLACK IRON SUPPLY <br /> AND RETURN TO GENERATOR L- _ PROJECT ENGINEER CHECKED BY J McGRATH <br /> EST/RO N0. SHEET 4 OF 6 SHEETS I <br /> APPROVED DRAWING N0. <br /> ;GALE t <br /> 1Q TEST POINT AT TANK BACK FILL 3 TEMPORARY TANK DETAIL 3 SUMP PENETRATION DTL (ENVIROFLEX PIPING) MANAGER Y- P_4 <br /> _ _.� <br /> a <br />