My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
REMOVAL_PLAN 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:36:46 PM
Creation date
11/6/2018 11:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 2002
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TWELFTH\10\PR0231873\REMOVAL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/43"ID COLLARS T. <br /> — — g — — 9 �� OFFSET CONSTRUCTION <br /> CIRCUMFERENTIAL SEAMS <br /> ) ) A-1 <br /> PLAN VIEW <br /> L� � <br /> D I DOUBLE BUTT CONSTRUCTION <br /> A B E F J A LOGITUDIAL SEAMS <br /> C G <br /> Q, p GLASSTEELM STEEL <br /> 36 " g' �' I g' g' 36 „ SECONDARY <br /> FIBERGLASS TANK <br /> COMPOSITE <br /> I I I I <br /> i ANNULAR_ <br /> / \ I SPACE <br /> /MODERN WELDING COMPANY PRIMARY TANK <br /> / OF CALIFORNIA <br /> HOEDOWN <br /> \ STRAP NI R ORUTTNL16 <br /> LOCATIONSIONS ENVIRONMENTAL <br /> OCIODETAILS <br /> INTERIOR: CLEAN OF DEBRIS, UNPAINTED <br /> I <br /> modern i EXTERIOR: F.R.P. COMPOSITE <br /> � � I <br /> T E S T I N G <br /> \ DOUBLE / I I THIS TANK ARRIVES AT THE JOBSITE UNDER VACUUM <br /> AND DOES NOT REQUIRE FURTHER INTEGRITY TESTS. <br /> WALL / I I IF JOBSITE PRESSURE TEST REQUIRED, AIR TEST AT <br /> \ <br /> STRIKER IKER PLATE NOT MORE THAN 5 P.S.I. PRIMARY, (INNER) TANK TO <br /> GLASTEEL i I fTYPICAL UNDER BE TESTED ALONE. SECONDARY TANK TO BE TESTED <br /> — — — L ALL OPENINGS I WITH PRESSURE IN PRIMARY TANK. AT NO TIME SHALL <br /> — — — — — — — — — — — — — — — — — — — — — — THE PRESSURE IN SECONDARY TANK EXCEED THE <br /> PRESSURE IN THE PRIMARY TANK. HOLIDAY TEST <br /> F.R.P. COMPOSITE AT 35,000 VOLTS AT FACTORY. <br /> END VIEW SIDE VIEW <br /> FIBERGLASS-COATED DOUBLE WALL STEEL UNDERGROUND STORAGE TANK SYSTEM INSTALLATION <br /> FIBERGLASS COATED DOUBLE WALL STEEL TANKS. "MODERN WELDING—ENVIRO 16" <br /> SHOWN—ALTERNATE EQUAL MANUFACTURERS TO BE FABRICATED TYPICAL & APPROVED BY <br /> SBC ENVRONMENTAL MANAGEMENT. SEE SITE SPECIFIC PLAN FOR CAPACITY AND <br /> QUANTITY OF TANKS. <br /> 0 <br /> UNDERGROUND FUEL STORAGE TANK <br /> ��� n>E doe ,HJe� <br /> UNLESS OTHERWISE SPECIFIED, TANKS SHALL BE INSTALLED FOUR (4) FEET BELOW FINISHED YARD GRADE <br /> TANKS SHALL BE SET ON A FIRM BASE OF 12" THICK CLEAN, WASHED, COMPACTED SAND AND w <br /> SURROUNDED ON ALL SIDES BY A MINIMUM THICKNESS OF 12" OF CLEAN, WASHED SAND. WET AND ROD o- <br /> SAND UNTIL IT IS THOROUGHLY COMPACTED. AFTER PIPING HAS BEEN INSTALLED, INSPECTED AND TESTED, \ / <br /> COMPLETE THE BACKFILLING WITH SAND. BACKFILL WILL BE PLACED IN SIX (6) INCH LAYERS. EACH LAYER I. <br /> SHALL BE PUDDLED AND TAMPED TO PREVENT FUTURE SETTLEMENT. THE NEED FOR PROPER BACKFILL AND <br /> COMPACTION IS COMPOUNDED WITH A DOUBLE WALL TANK AND ALL CONCERNED ARE FOREWARNED OF THIS <br /> S REQUIREMENT. ALL COMPACTION TO BE 907. REVISIONS / AUTHORIZATIONS <br /> 8 <br /> "i AFTER TANKS ARE DELIVERED TO SITE, TANK MANUFACTURER OR SUPPLIER IS RESPONSIBLE FORNo. RLNsioNs / AuwoRlunoNs DATE BY <br /> PERFORMING THE 35,000 VOLT HOLIDAY TEST AND REPAIR ANY HOLIDAYS DISCOVERED. THESE TESTS 13TANK SHALL MEET THE REQUIRMENTS OF NFPA 30 & 31. <br /> +roro, MED <br /> MUST BE WITNESSED BY ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. TANK SHALL MEET THE REQUIRMENTS OF UFC. ISSUED FOR BIO <br /> 13TANK SHALL MEET THE REQUIREMENTS OF SCAQMD ISSUED FOR CONSTRUC'nON 3/7n2 MED <br /> NO PRESSURE TEST IS REQUIRED BY THE CONTRACTOR IF THE TANK IS DELIVERED TO THE JOB SITE WITH METHANOL COMPATIBILITY RULE 1170. <br /> rL VACUUM TEST, APPLIED BY THE TANK MANUFACTURER, IN PROGRESS. O TANK SHALL BE BUILT TO THE SPECIFICATIONS OF <br /> ACT 100, STEEL TANK INSTITUTE SPECIFICATION FOR THE <br /> _ FABRICATION OF FRP/CLAD UNDERGROUND TANKS. PROPRIETARY SBC INFORMATION <br /> REQUIRED INTEGRITY TANK (NON-VOLUMETRIC) VACUUM METHOD TO BE PERFORMED BY NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> TANKNOLOGY CORPORATION. TANK TEST RESULTS TO BE SENT TO SBC ENVIRONMENTAL 13TANK SHALL BEAR THE U.L. 1746 LISTING MARK FOR ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN <br /> MANAGEMENT. SECONDARY CONTAINMENT COMPOSITE UNDERGROUND TANK THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> FOR FLAMMABLE LIQUID STORAGE AND THE ACT 100 LABEL ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> FOR CORROSION PROTECTION OF UNDERGROUND STORAGE P�RERiSMAND AUTHORIZATIOONSNFOROBUILIDINGS PCONSTRUCTIION, <br /> TANKS. AND OR ZONING CHANGES. <br /> DRAWINGS PREPARED FOR <br /> y J 1 4" FNPT MONITOR (f��ENM"MENTAL MANAGEMENT <br /> SIZE DIAMETER LENGTH WEIGHT STRAPS H 1 4" FNPT MONITOR / PACIFIC REGION <br /> J <br /> 1 ,500 65" 9'-6" PROECT TME 4,400# 2 G 1 4" FNPT MONITOR PACIFIC BELL FACILITY <br /> 2,000 65" 12'-6" 5,200# 2 F 1 4" FNPT MONITOR <br /> 3,000 65" 18'-6" 6,100# 2 E 1 4" FNPT MONITOR 10 EAST 12TH STREET <br /> 9 4,000 85" 14'-6" 7,300# 2 D 1 4" FNPT MONITOR TRACY, CALIFORNIA <br /> 9 5,000 97" 14'-1" 10,000# 2 " FNPT MONITOR <br /> g I 6,000 97" 16'-6" 11,675# 2 C 1 4TRACCA11 UE058 <br /> $� <br /> 8,000 97" 22'-0" 14,050# 2 B 1 4" FNPT MONITOR sHEErrnTE: <br /> 10,000 97" 27'-6" 16,550# 3 A 1 2 1/2' FNPT MONITOR EMERGENCY GENERATOR SUCTION SYSTEM <br /> 12,000 97" 32'-6" 19,175# 4 MARK REQ'D SIZE TYPE RATING REMARKS TANK ORIENTATION/FITTING LAYOUT <br /> 15,000 115" 29'-0" 25,500# 5 1 1 1 1 1 1ESTIMATE/ ROUTINE ORDER: DATE. 03/07/02 1 SCAM. AS NOTED <br /> 20,000 115" 38'-6" 31,750# 6 SCHEDULE OF OPENINGS UP 354E DRAWN Br: SK I CHECKED B. MED <br /> 4 NOTE: OTHER TANK DIAMETERS ARE AVAILABLE. j� ARCfffW • KiGQiMBG • RMONI�i'fAL MMCEg SBC AUTHORIZATION: SHEET: g OF: a SHEETS SHEET NO. <br /> gg <br /> CONTACT MODERN WELDING AT (559) 275-9353I�fa I�ZL 1137 N. MCDOWELL BLVD. PETALUMA, CA 94954 (707) 765-IB60 SBC DRAWING NO.: <br /> Omm LIC JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER _ TR AC 1 1 -01 - 01111 F6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.