Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran,R.E.H.S. Carl Borgman,R.E.H.S. <br /> Director <br /> 304 East Weber Avenue, Third Floor <br /> Mike Huggins,R.E.H.S.,RD.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> c Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> 9 F O BN Laurie A.Cotulla,RE.H.S. Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> Walton Engineering, Inc. March 28, 2002 <br /> Attention: Michael Walton <br /> 3900 Commerce Dr. <br /> West Sacramento, CA 95691 <br /> RE: Econo Gas, 880 Victor Rd., Lodi CA 95240 <br /> Your application for permit to install new underground storage tanks at the above <br /> location has been approved with the following conditions: <br /> 1. Contact fire department for permit. <br /> 2. All new submittals supercede the previous ones. <br /> 3. Both primary and secondary pipes shall bear a UL label. <br /> 4. All pipe fittings and connections shall bear a UL label. <br /> 5. All monitoring systems shall be listed on the LG113-14. <br /> 6. All testing shall be in compliance with manufacturer's instruction, section 2635 and <br /> section 2636 of California Code of Regulations (CCR) <br /> 7. Automatic pump shutdown must satisfy CCR 2636(g)or annual line test will be <br /> required. <br /> 8. Buoyancy calculations must be provided and approved by the EHD prior to <br /> completion of the tank setting. <br /> 9. Line leak detector must be provided as stated on cut sheet—VMI 99 LD-2200. <br /> 10. All piping types must be as provided in the attached cut sheets. <br /> 11. Vent line shown on plans must be cathodically protected, if any metal parts are used. <br /> 12. Must perform a Holiday Test and pass test prior to setting the tank in the ground. <br /> 13. Plan sheets Tl and TLI (revised), as provided to the EHD on 3/25/02, must be <br /> attached to each set of plans. <br /> 14. Any changes shall be submitted to EHD for approval prior to commencing work. <br /> 15. Submit proof of tank and piping certification for employees. <br /> 16. An accurate and drawn-to scale-as-built plan must be submitted to EHD prior to <br /> scheduling a final inspection. <br /> 17. Contact Ray von Flue for inspection. See inspection checklist for the required <br /> inspections. All appointments must be scheduled 48 hours in advance. <br /> 18. This permit expires at the end of the calendar year. <br /> If you shall have further questions please contact me at (209)468-9848. <br /> Ray von Flue <br /> Environmental Health Specialist <br />