My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002 DIESEL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
INSTALL_2002 DIESEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:29 PM
Creation date
11/6/2018 11:56:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 DIESEL
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\DIESEL INSTALL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
modern <br /> Modern Welding Company, Inc <br /> Installation Instructions - Glasteel II Jacketed Steel Tanks <br /> INTRODUCTION <br /> 4.3 For Glasteel [l [auks Fabricated without <br /> 1.0 Proper installation is essential to the expected product dielectric isolation, (threaded nylon bushings or <br /> life and performance on Moderns Glasteel II flange isolation kits) this tank must use either: <br /> Underground Storage Tank.This tank must be A)Non-metallic piping,or <br /> installed in accordance with these installation B) Conductive piping must be isolated from <br /> instructions, the latest issue of N.F.PA.30 and 31 the backfill material and any other metal <br /> pamphlet, the PEI/RP-100 and local authorities or grounding device. <br /> having jurisdiction over underground tank installations <br /> and codes. TESTING <br /> 1.1 Although the instructions are clear and precise, <br /> unexpected conditions often occur and thus $.0 Glasteel II tanks are shipped with a vacuum on <br /> prudent thought, coupled with extreme care the annular space.If a minimum of 5.3 inches <br /> become the proper procedure. Hg of vacuum is maintained for one hour, both the <br /> inner tanks and outer tank may be considered <br /> TANK HANDLING properly tested. Fluctuations in interstice vacuum <br /> are caused by temperature and barometric <br /> 2.0 Extreme caution shall be used wben handling the pressure changes. <br /> tank. Do not drop or roll the tank. NOTE!NFPA 30: 2-8.3:1 Secondary containment <br /> 2.1 Equipment to lift and lower the tank shall be of tanks shall have the interstitial(annulus) space <br /> sufficient capacity to do so without dragging or tested using vacuum at 5.3 in-$g. The vacuum <br /> dropping the tank. shall be held for one hour. Care shall be taken <br /> 2.2 The tank shall be lifted and lowered using the to ensure that the interstitial space is not <br /> lifting lugs or lifting plugs provided. Cables or subjected to excessive vacuum. <br /> chains used shall be of adequate length. No NFPA 30: 2.8.4: "Before the tank is initially <br /> circumstances warrant the use of chains or slings placed in service, all leaks or deformations shall <br /> around the tank shell.Maximum angle of the be corrected in an acceptable manner." <br /> sling shall be 60 degrees. CAUTION: Do Not Pressure Test Interstitial <br /> TANK STORAGE (Annular)Space. <br /> 3.0 If tank is stored on site prior to installation, a EXCAVATION AND BEDDING <br /> secure area shall be chosen.Special attention 6.0 Glasteel II underground storage tanks are <br /> shall be placed in selectingthe storage location to designed to withstand a maximum burial depth of 60". If <br /> assure the absence of rocks and foreign objects a greater burial depth is required,contact the <br /> that might cause damage to the tank exterior. manufacturer immediately. <br /> 6.1 The excavation shall be properly accomplished <br /> and free from any material or object that would <br /> cause damage to the tank exterior. <br /> 6.2 The bottom of the excavation shall be suitably <br /> graded and leveled.The foundation for the tank <br /> shall be a minimum of 6 inches of clean,inert, <br /> compacted sand,or 6 inches of pea gravel, the <br /> largest particle of which does not exceed 3/4 inch, <br /> orrounded•edge gravel erushings, angular <br /> particle size required to be not less than 1/8" <br /> or more than 1/2".See chart in"Backfill Section' <br /> INSPECTION 6.3 There shall be a minimum of 12 inches from the <br /> 4.0 Visually inspect the tank exterior for damage. outside edge of the tank to the inside edge of the <br /> Any extreme gouging or abrasion should be carefully excavation.This distance shall remain true for <br /> reviewed and appropriate action taken. the entire perimeter surrounding the tank. <br /> 4.1 Remove thread protectors and shipping plugs REMOVE LARGE OR SHARP nocK <br /> from all openings(except vacuum gage location). FROM FsrJVA1" <br /> Using compatible, non hardening pipe sealant, t,uNO'"uM �r <br /> install permanent metal plugs in all unused <br /> openings. <br /> 4.2 Refer to Modern Welding Company's publication, <br /> "Finishing Instructions" for proper installation of ev trPE aAstEgr <br /> pormanent coverings for unused openings and s <br /> lifting lugs. Li FAR,INERT SAW... 0�C <br /> PEA OAN L <br /> + on crosk"S1ONE'. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.