My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002 DIESEL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
INSTALL_2002 DIESEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:29 PM
Creation date
11/6/2018 11:56:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 DIESEL
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\DIESEL INSTALL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nTank <br /> Institute <br /> APRIL 1999 <br /> Owner of Tank: ACT-100' Label No. <br /> Location of Tank: Date: <br /> CHECK() CHECK() <br /> HANDLING When anchoring with a concrete hold down pad, <br /> The handling equipment is of adequate size and a minim, 6 inch(152.4 mm)layer of pea <br /> capacity to lift and lower the tank without dragging over the concrete pad dimensions to separate <br /> or dropping. tank from pad T <br /> The repair of any damaged laminate areas has been When deadman anchors or hold down pads are used, <br /> made in accordance with installation instructions. i hold down straps have been separated from the tank <br /> by an inert insulating dielectric material at least <br /> Prior to storage,the tank has been chocked with 1 inch(25.4 mm)wider than the steel hold <br /> wood blocks or tires. _.w. down straps. <br /> EXCAVATION Tank is electrically isolated from the hold <br /> When no anchoring is required,the site has been down strap. <br /> excavated deep enough to enable 1 foot of clean <br /> sand or gravel to act as bedding material between BACKFILL <br /> native soil and tank Homogenous backfill consisting of clean sand, <br /> pea gravel or#8 crushed stone bas been used. <br /> Burial depths meet minimum code requirements Backfill has been placed along sides of tank to ensure <br /> (such as NFPA 30). full support along the tank's bottom quadrant. <br /> TESTING PIPE CONNECTIONS <br /> The tank has been air-tested at 5 psig(kPa)while Nonconductive piping used. <br /> applying soap solution onto weld seams and <br /> fittings to check or leaks. _ _ Metallic piping used. <br /> OR <br /> on a double wall tank,a vacuum test has been Dielectric bushings or flanges installe& <br /> performed in accordance with the fabricator's <br /> instructions. <br /> All local and state testing requirements have Signature and Title of Installing Foreman and/or Project <br /> been performed. Engineer <br /> ANCHORING <br /> Not applicable to this site. <br /> Deadman anchors used. _ <br /> Concrete pad. Installing Contractor <br /> Soil and pavement overburden will hold down tank <br /> (reference PEI/RP 100), <br /> 570 Oakwood Pond Note:This rhecklist includes certain key steps In the proper <br /> fake Zurich IL 60047 installation of the ACT-100-Urs'tank and b Intended only as an aid to <br /> task Installers who are knowtedgab-e and experienced to <br /> Phone:847438-8265 underground tank imtallatlon. Compliance herewltb does not <br /> Fax:847-x78.9766 oaenar4y meet the requirements of&U applicable federal,sum and <br /> -oral Iawt,retu-adorn stud ordldaneea concerning tank Installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.