My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002 DIESEL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
INSTALL_2002 DIESEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:29 PM
Creation date
11/6/2018 11:56:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 DIESEL
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\DIESEL INSTALL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. UST SYSTEM DRAWING INFORMATION ' <br /> 1. J Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. A Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. YC Striker plates or drop tube-mounted bottom protectors Illustrated below all accessible openings. <br /> 5. .( Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) 8 26351 <br /> B. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) 8 (4)1 <br /> It. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health 8 Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # * # <br /> CAPACITY I Z 1D0 U <br /> MANUFACTURER 144 nN)F_7�t <br /> COMPOSITION STL 1:110 <br /> MODEL t;I.hS Tft i <br /> PRODUCT l 6'S it-[- <br /> CORROSION PROTECTION f�rve <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL / <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> _ (1) Tested at the installation site using an electric resistance holiday detector. <br /> X_ (2) Vacuum applied to interstitial space. <br /> _ B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> _ C. Non-clad steel tank [Section 2635 (a) (2) (A)) <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.