My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
2300 - Underground Storage Tank Program
>
PR0231747
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:55:09 PM
Creation date
11/6/2018 11:58:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231747
PE
2381
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
02
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\900 1_2\PR0231747\1995 REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All site safety records pertaining to the site characterization study will be maintained <br /> by the Safety Coordinator/Project Manager throughout the project. <br /> AIR MONITORING <br /> The Safety Coordinator/Project Manager will conduct periodic air monitoring using <br /> direct reading sampling equipment as required. At a minimum the following <br /> monitoring will be performed: <br /> Total Organic Vapors <br /> A direct reading photoionization detection (PID) meter (HNU PI 101 or <br /> equivalent) will be used to monitor the concentrations of organic vapors in <br /> the work area. Measurements will be taken at least once every 15 minutes <br /> during surface and subsurface sample collection. The meter will be <br /> calibrated for benzene. Total organic vapor measurements will be used to <br /> determine the appropriate levels of respiratory protection and conditions for <br /> site evacuations. Total organic vapor concentrations in the workers' <br /> breathing zone in excess of 10 ppm above background will trigger an <br /> upgrade from level D to level C protection. Breathing zone concentrations <br /> in excess of 250 ppm will stop the work on-site until the work zone <br /> concentrations are reduced to below 250 ppm. <br /> EMPLOYEE TRAINING AND INFORMATION <br /> All personnel working have completed the certified, 40-hour OSHA hazardous waste <br /> training course, and have been trained in the following objectives: <br /> • Workers are aware of potential hazards they may encounter. <br /> • Knowledge and skills necessary to perform the work with minimal risk to <br /> workers' health and safety. <br /> • Familiarization with the Site Safety Plan and site-specific requirements. <br /> The training plan for this site encompasses: <br /> • Potential physical and chemical health hazards. <br /> • Respiratory protection, rationale, use, maintenance and fit testing. <br /> • Protective clothing, use and maintenance. <br /> • Entry, exit and decontamination procedures. <br /> • Documentation and record keeping procedures. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.