Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ L NEW PLAN ® 2.CHANGE OF INFORMA 1101, Rat' <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agenry Use Only <br /> BUSINESS NAME(Same as FACILITY NAME) Rol. <br /> Valley Pacific Petroleum-Victor Road Plant and Cardlock <br /> BUSINESS SITE ADDRESS Rua. CITY Ra. <br /> 930 E Victor Road Lodi <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> S If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> r Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for the.intended use,will be managed as hazardous waste. <br /> Y Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary commanent systems,or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick Boating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released producuwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan, This <br /> equipment is inspected at least monthly,and after each use,supplies arc replenished as needed. Detective equipment is repaired or replaced as necessary. <br /> EQUIPN1ENT NOT PERMANENTLY ON-SITE,HITT AVAILABLE FOR USE IF NEEDED: (complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Absorbent RIO' 166 Frank West Circle,Stockton R or 24/7 Rw. <br /> Brooms,Shovels,Covered Drums Rn, 166 Frank West Circle,Stockton R21. 24/7 <br /> RI2. Rzz. Raz. <br /> R13. R23. R33. <br /> RIC R24. Ria. <br /> R15. R2t. Ras <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo. TITLE R50. <br /> Mike Eliason Cardlock Manager <br /> NAME MI. TITLE R51. <br /> Pratipns Manager <br /> NAME Nathan Crum R42 TITLE Rsz <br /> Risk Manager . <br /> NAME R43_ TITLE Rs3. <br /> Dan Elmer President Commercial Operations <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> M Additional system testing or data collection dllnspection by qualified persons XRecalibmtion of equipment <br /> Other: <br /> Rha. <br /> UST Response Plan(3/2008)-113 <br />