Laserfiche WebLink
.oarto OF rrtusrEEs SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> ►awwr Cuttwlaon, Praa, i SEAVINQ <br /> Particle E. Vannucci, sec•y. City of loll <br /> Anlhonatta Van Spronaan 1601 East Hazelton Avenue, P. Q. Box 2069 son Joaquin counly <br /> Earl Plmanlal._ SlOcklon, California 95201 City, of Eacalon <br /> fun Bupbaa City of Manteca <br /> Oanl.l t.. Mora, 209/466-6761 CRY at Ripon <br /> John D. Mut, M.D. City of Stockton <br /> 11114M J. Wade Joel Khanna. M.o.. M.P.H.. 01sukt Health Ofticw City of Tracy <br /> my Anna Mori San JoaQuln County <br /> son Joaquin County <br /> Facility Name , ] , �— <br /> l"' <br /> Address 9 L4 p ' <br /> Date of Inspection ��- 'p��(cz.�. Inspector Qaa.r- f <br /> MONITORING ALTERNATIVE a7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of *5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> _V'-"'Annual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> __Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> J Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded friday night before <br /> locking and again on Monday morning before opening. ) <br /> v' If liquid level varies more than 1% of the tank volume or 5 gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assurned to have occurred and shall be reported to the local agency within <br /> 24 hours , as {tier Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations . <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> Precision test(s ) must be performed by _ and results submitted to this <br /> Office within 30 days of the test. —' <br /> r t •� Tank gauging must be started inrnediately. (See instructions above). <br /> If th"! above compliance dates cannot be met , contact till', office prier to tho specified <br /> date. <br /> /86 uG T 3 <br />