My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
940
>
2300 - Underground Storage Tank Program
>
PR0231338
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 3:51:47 PM
Creation date
11/7/2018 12:02:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231338
PE
2381
FACILITY_ID
FA0003921
FACILITY_NAME
D J KELLER TRUCKING INC
STREET_NUMBER
940
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905044
CURRENT_STATUS
02
SITE_LOCATION
940 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\940\PR0231338\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
8/18/2017 6:52:23 PM
QuestysRecordID
3592967
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before malting the change. <br /> Required by Sections 2632(d) and YA1(h) CCR- <br /> Facility <br /> CRFacility Name urs � 2 7YU CG �- <br /> Facility Address -0 4c L /1"r /Z 9j 12-6� i <br /> A. Describe the frequency of performing the monitoring: <br /> Tank 'a.0 0 / A (4 -/-A rJ 1&- L2 ) rf R1 u7 w E I,C <br /> si- C-if <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tanko.(� �„� S c L a tie <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Gu F•e ' l�— - <br /> E. Reporting format for monitoring:o p � <br /> Tank <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: <br /> G. Describe the training necessary for the operation of USTsyst m, including piping, <br /> and the monitoring equipment: <2 54 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.