My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
9575
>
2300 - Underground Storage Tank Program
>
PR0503972
>
REMOVAL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:06 PM
Creation date
11/7/2018 12:03:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1987
RECORD_ID
PR0503972
PE
2381
FACILITY_ID
FA0009423
STREET_NUMBER
9575
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95240
APN
051-120-10
CURRENT_STATUS
02
SITE_LOCATION
9575 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\9575\PR0503972\REMOVAL 1987 .PDF
QuestysFileName
REMOVAL 1987
QuestysRecordDate
10/30/2017 9:12:20 PM
QuestysRecordID
3709246
QuestysRecordType
12
QuestysStateID
1
标签
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />UNDERGROUND STORAGE TANK CLOSURE PLAN <br />FOR <br />PACIFIC GAS AND ELECTRIC COMPANY <br />TRACY SERVICE CENTER <br />OCT 01 1987 <br />ENVIROMENTAL HEALTH <br />PERMIT/SERVICES <br />1. Location: Victor Service Center, 9575 Victor Road, Victor, California. <br />2. Physical Description: One 3,000 gallon, single wall steel tank, with <br />associated piping. <br />3. Contents: None. Previously contained unleaded gasoline. <br />4. Contractor: T be awa, ded.�QH, /1 w <br />5. Soil Sampling: The soil sampling and testing will be performed by The <br />Twining Laboratories, Inc. <br />6. Notification: The San Joaquin Local Health District will be notified at <br />least 48 hours prior to tank removal and soil sampling. <br />7. Procedures: Before excavation begins, any residual sludge or free liquid <br />will be removed from the tank. Clean excavated material will be <br />stockpiled on-site for use in backfilling the excavation. The tank and <br />piping will then be uncovered with a backhoe. The piping will be removed <br />and stockpiled for off-site disposal. <br />The Tank will be decontaminated y=haipulled <br />All rinsate, emaining <br />oil, product, sludge, etc., will ba Facility <br />by a licensed hazardous waste haun accordance with PGandE <br />and The San Joaquin Local Health District. <br />Flammable vapors will be purged by introducing 1.5 pounds of dry ice into <br />tank per 100 gallons of tank capacity and sealing all openings, except the <br />vent port, at least one hour before tank removal. Following removal, the <br />decontaminated tank will be cut up into several pieces and disposed of as <br />scrap. <br />Any obviously contaminated soil will be excavated and stockpiled for <br />off-site disposal. Soil samples will then be taken from the bottom of the <br />excavation and laboratory tested for total petroleum hydrocarbons. At <br />least one sample will be taken for every 200 square feet of tank <br />excavation and for every 20 linear feet of piping excavation. <br />Following completion of closure activities, the excavation will be <br />backfilled and compacted. Asphaltic concrete pavement will be placed on <br />top of backfilled area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.