Laserfiche WebLink
VYIUTIEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONTTQRING PROGRAM <br /> This monitoring program mast be b=at the USr kxadon at all Mmes The hLiMmIldon on this monitoring <br /> program are conditions of the aeradng Pmt Ile permit holder mirst notHt San loaquin County <br /> Environmental Health Di knL phone C2M 468.3420 widdn 30 days of mp changes to the monitoring <br /> procedures,naiesx required to obtain approval before mating the change. <br /> Regdrtd by Secxiouss 2632(d) and 2641(h) CCR. <br /> Fatuity Name LINDEN ASSOCIATED GROWERS, INC. <br /> Facility Address 14175 E. HIGHWAY #26 LINDEN, CA 95236 <br /> A. Describe the frequcnc�7 of performing the monitoring: <br /> Tank Continuous electronic monitoring using a Yeeder--Root ILS 250 <br /> Piping Same <br /> B. What methods and e#pment, identified by name and model, will be used for <br /> performing the mmg: <br /> 'fang Continuous electronic monitoring using a Yeeder-Root ILS 250 <br /> Piping <br /> C. Descn-be the locati=(s) where the monitoring wM be performed (facility plot plan <br /> should be attached): <br /> The monitor is located in the adjacent warehouse. <br /> D. List the name(s) and=- de(s) of the people responsible for performing the monitoring <br /> and/or maintaining _e equipment <br /> Charles Busalacchi <br /> E. Reporting format frr monitoring: <br /> Tank The monitor` and daily inspection log. <br /> piping Same <br /> F. Describe the prev=z�re maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with, the manufacturers' maintenance schedule <br /> but not less than every LMonths: <br /> The monitoring system shall be inspected <br /> and tested annually by an approved company. Reports shall be forwarded <br /> to San Joa uin Co. P.H.S. <br /> G. Describe the traink-a necessary for the operation of UST system, including piping, <br /> and the monitoring!q ipment: Em 10 ees were trained by the installation <br /> contractor and equipment supplier in the use of the pump, emerAency shut <br /> off switch and monitoring system. Yeeder-Root. <br />