Laserfiche WebLink
Jun 02 04 12: 33p Mile Datten (2p ) 533-2650 P. 2 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: NIA <br /> Com le_te the folio►win checklist: <br /> ®Yes ❑ No* Is the audible alarm rational? <br /> Yes 1 ❑ No* Is the visual alarms o erational? <br /> ❑Yes ❑ No* I Is the print function operational? Not installed. <br /> ED Yes ❑ No* Were all sensors visual!y inspected,functional!y tested and confirmed operational? <br /> ®Yes ❑ No* Were atl sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> ❑ Yes No* If alarms are relayed to a remote monitoring station, is all conequi <br /> ununieations <br /> ❑ pment (e.g. modem) <br /> I� N/A operational? <br /> ❑Yes ❑ Noy` For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ® N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes;which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm Positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill wanting device (i.e. no <br /> ® NIA mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill oint(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger.? <br /> Z Yes* ❑ No Was any monitoring equipment replaced? If yes., identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ®Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product; ® Water. If M, describe causes in Section E,below. <br /> ®Yes ❑ No* Was monitoring ^stem set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* I Is all monitoring equipment oerational r manufacturer's ifications`? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Cotnlments: Fillspill buckets on both gas and diesel tanks failed. Elite IV Contractors were contacted to perform <br /> repairs and upgrade to VR-102. <br /> Page 2 of 3 03/01 <br />