Laserfiche WebLink
SWRCB,January 2002 i � Page-,3--of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauges Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of - <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: crass= . Fail` Pass .Fail Pass= hail Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i svr/ f u�, <br /> a f <br />