Laserfiche WebLink
`SWRCB,January 2002 Page—7-of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: X Spill Bucket Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> oBucket <br /> Equipment Used: Visual Equipment Resolution: <br /> Spill Box# Spill Box#6 Spill Box# Spill Box# <br /> Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and fd <br /> starting test: <br /> Test Start Time: 7; 9,9 Alw 7; 3 0 41�w. <br /> Initial Reading(R,): i/ 1/ <br /> Test End Time: : 3&9 *O1' �'; 3®,rJ�► <br /> Final Reading(RF): <br /> Test Duration: , <br /> Change in Reading(RF-R,): - a, <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test.Result: assn Fail; Fhs Fail Pass: Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />