My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/7/2018 12:04:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\T\HWY 26\14175\PR0234383\COMPLIANCE INFO 1992-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVI#iQNMENTAL HEALTH DEPARTM L L, <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I _ v <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mat <br /> PLAN TYPE MONITORJNG IS IDENTICAL FOR ALL USTs AT THIS FACILITY, <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST-SYSTEM(S): DE O''I IT i^i [fit 11 C ' <br /> I. FACILITY INFORMATION <br /> /;AGILITY IDI![ARencv Use QnlvJ <br /> FACILITY NAME <br /> FACILITY SITE ADDRESS �'� tl{ Mw TY Mu <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g._sensors,probes,line teak detectors,etc-)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is mare frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1,ANNUALLY ❑ 99.OTHER(Specify): Mal <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is pertbnned(i.e.,location of etch sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g-,current UST Monitoring Site Plan from a Monitoring,System CerEirtcation <br /> form,Hazardous Materials Business Plan ma ,etc.)which shows all aired information,include it with this plan. <br /> IV. TANK MONI'T'ORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) in <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULTS) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ® c.UNDER PRESSURE ❑ d.UNDER VACUUM R911 <br /> PANEL MANUFACTURER: MIx <br /> MODEL 9: M f 7- <br /> LEAK SENSOR MANUFACTURER: 1 j;[- M3° MODEL 9(5): -'q y_` 0 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGCt WALL TANK(S) <br /> PANEL MANUFACTURER: Mlr4 MODEL if: Mt7 <br /> IN-TANK PROBE MANUFACTURER: M"- MODEL k(S) M19 <br /> LEAK TEST FREQUENCY_ ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY L120 <br /> d.MONTHLY ❑ e.OTHER(Specify): „+?+ <br /> PROGRAMMED TESTS: ❑ a.0-1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> Mr M2J. <br /> ❑ 3 INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 MU <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR¢2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR,x§'2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.131ENNIALLY ❑ c.OTHER(Specify): Mer- ntrt. <br /> &6-VISUAL MONITORING DONE: W a.DAILY 0 b.WEEKLY(Reqs w aSe"apprmmll <br /> 99.OTHER(Specify): L ©• M2ls. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Cheek all that apply) Man. <br /> ❑ ].CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMPOYTRENCH(Fs)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM "t1t <br /> PANEL MANUFACTURER: MI- MODELfl: Mia. <br /> LEAK SENSOR MANUFACTURED Moa- MODEL JIM: MIK, <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b,NO Mfr' <br /> WILL FATLUR(DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a_YES ❑ b.NO Mal <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS D)TGCfED <br /> MI-LD MANUFACTURER(s): KM MODEL N(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> FIA.D MANUFACTURER: M411 MODEL C n141. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a,MINIMUM MONTHLY 0.2 g.p,h. ❑ b.MINIMUM ANNUAL 0 I6 p h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? M41. <br /> ❑ a.YES ❑ b.NO <br /> WILL ELLD FAILURE(DISCONNECTTON TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES [I b_NO Mao. <br /> C14.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY 0 b,EVERY 3 YEARS ❑ C.OTHER(Specify) Mas. tiu <br /> s. . <br /> Qj 5.VISUAL MONITORING DONE: Ela.DAILY C1 b-WEEKLY* c.MIN_MONTHLY&EACH TIME SYSTEM OPERATED** M47 <br /> . Rcq T ageur avpm al '•Nlm,ed fm m ll iiminr or,nbmied e"mFganc y S=pan,Cud piping only per HSC 051%1.5(6)[7) <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIP]NG IS CONNECTED TO THE UST(s) <br /> 99.OTI IER(Specify) G1 Q M48 <br /> S,ICEHI>Ld(07M31-114 <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.